document.
Give this one a try later!
Non-Materiel Solutions
Performance parameters considered by the user to be the most essential
Give this one a try later!
Key Performance Parameters (KPP)
, Part of the J-8 that applies to all documents describing ACAT II and below program
which require one or more joint endorsements or certifications, and are below JCB
interest level.
Give this one a try later!
Joint Integration
This is the first step of the JCIDS process and analyzes the military's capability needs
and gaps, and recommends both materiel and non-materiel ways to address the gaps
Give this one a try later!
Capabilities Based Assessment (CBA)
A new item developed or purchased to satisfy one or more capability requirements.
These solutions are executed in the DAS process and are guided by capability
requirement documents from the JCIDS process.
Give this one a try later!
Materiel Solution
Is the desired value, which results in an operationally significant increment above the
threshold.
Give this one a try later!