In this MCA phase we produce a limited number of units and test the units
to make sure that they work and after that is we produce and deploy the
full set.
MCA Purposes
Give this one a try later!
Develop technology, produce weapon systems, and provide logistics
support.
,Critical Design review (CDR)
Give this one a try later!
A multi-discipline review to ensure that a system can proceed into
fabrication which includes Adequate developmental Testing (DT),
Environmental, Saftey, and Occupational Health (ESOH) assessments,
Completed Failure Modes, Effects, and Criticality Analysis (FMECA), etc
DAS Governing Document
Give this one a try later!
DODD 5000.01, DoDI 5000.02, DoDI 5000.85, and Defense Acquisition
Guidebook
International Acquisition and Exportability (IA&E) Policy Objectives
Give this one a try later!
Operational, Economic, Technical, Political, and Industrial
Industrial (IA&E)
Give this one a try later!
, To Bolster domestic and allied defense industrial bases.
Milestone A
Give this one a try later!
Also referred to as the Risk Reduction Decision, is an investment decision
to pursue specific product or design concepts, and to commit the
resources required to mature technology and/or reduce any risks that must
be mitigated prior to committing the resources needed for development,
production, and fielding. A successful Milestone A decision leads to entry
into the TMRR phase.
EMD (Product Support Process)
Give this one a try later!
Engineering Review > Product Support Package > Performance Testing
MDA Determination of Milestone A
Give this one a try later!