Worksheet 8 Medgas Exam with verified || || || || || ||
detailed answers ||
Which of the following conditions must be met where medical gas and vacuum systems are
|| || || || || || || || || || || || || || ||
installed by non-certified personnel? || || ||
Installation by anyone other than 6010 certified personnel is NOT permitted
|| || || || || || || || || ||
The minimum back filled cover for buried piping shall be 36 in., except that a minimum cover
|| || || || || || || || || || || || || || || || ||
shall be reduced to _______ inches where physical damage is otherwise prevented.
|| || || || || || || || || || ||
18
WAGD networks shall provide a WAGD inlet in all locations where ___________ is intended to
|| || || || || || || || || || || || || || ||
be administered.
||
nitrous oxide ||
Which type of tube hangers are permitted in a potentially damp location?
|| || || || || || || || || || ||
Plastic coated ||
Metallic flexible joints are being used in the pipeline for vibration control. Which of the following
|| || || || || || || || || || || || || || ||
is not required of such joints?
|| || || || || ||
Suitable for service at 150 psig or above || || || || || || ||
detailed answers ||
Which of the following conditions must be met where medical gas and vacuum systems are
|| || || || || || || || || || || || || || ||
installed by non-certified personnel? || || ||
Installation by anyone other than 6010 certified personnel is NOT permitted
|| || || || || || || || || ||
The minimum back filled cover for buried piping shall be 36 in., except that a minimum cover
|| || || || || || || || || || || || || || || || ||
shall be reduced to _______ inches where physical damage is otherwise prevented.
|| || || || || || || || || || ||
18
WAGD networks shall provide a WAGD inlet in all locations where ___________ is intended to
|| || || || || || || || || || || || || || ||
be administered.
||
nitrous oxide ||
Which type of tube hangers are permitted in a potentially damp location?
|| || || || || || || || || || ||
Plastic coated ||
Metallic flexible joints are being used in the pipeline for vibration control. Which of the following
|| || || || || || || || || || || || || || ||
is not required of such joints?
|| || || || || ||
Suitable for service at 150 psig or above || || || || || || ||