How many samples are required to create a composite sample? - ✔✔3 samples
|| || || || || || || || || || || ||
When core sampling, where should nuclear density gauge test be taken? - ✔✔Test should be
|| || || || || || || || || || || || || || ||
taken prior to coring in same location
|| || || || || ||
What is a "Lot" comprised of? - ✔✔A lot is split up in 5 different samples called "Sublots"
|| || || || || || || || || || || || || || || || ||
When sampling from a paver auger, where should the sample be taken? - ✔✔Sample should be
|| || || || || || || || || || || || || || || ||
taken from the end of the auger
|| || || || || ||
When sampling from roadway, where should sample be taken? - ✔✔Immediately behind paver
|| || || || || || || || || || || || ||
and Infront of breakdown roller
|| || || ||
When sampling from roadway, how far away should rollers stay away? - ✔✔Rollers should be
|| || || || || || || || || || || || || || ||
10' away from sampling area
|| || || ||
When sampling from the roadway, what're the type of sampling methods? - ✔✔Plate with cookie
|| || || || || || || || || || || || || || ||
cutter, Plate method, non-plate method
|| || || ||
What is the requirement when using plate method for sampling from roadway? - ✔✔1. Plate is
|| || || || || || || || || || || || || || || ||
placed 10' Infront of paver and at least 2' on the inside edge of the mat
|| || || || || || || || || || || || || || ||
2. 3 samples must be acquired
|| || || || ||
What are the requirements when sampling from a paver? - ✔✔1. Trim 8-12" before taking sample
|| || || || || || || || || || || || || || ||
2. Remove 6-10" of material in center of hopper
|| || || || || || || ||
3. Take sample directly into vertical face
|| || || || || ||
, What are the requirements for sampling from stockpiles? - ✔✔1. Remove 4" of outermost layer
|| || || || || || || || || || || || || ||
2. Obtain sample as close as possible to the intersection of horizontal and vertical face.
|| || || || || || || || || || || || || ||
How many sections should be split from a sample container when " sample splitting"? - ✔✔4
|| || || || || || || || || || || || || || ||
What are the requirements for sampling from a loaded truck? - ✔✔1. Truck should be split into 4
|| || || || || || || || || || || || || || || || || ||
different quadrants ||
2. Remove 4" of outermost layer
|| || || || ||
3. 3 increments placed on sample container
|| || || || || ||
What is open-graded Asphalt? - ✔✔Top course permeable layer that supports drainage, tire
|| || || || || || || || || || || || ||
dampening and road spray || || ||
What is dense-graded Asphalt? - ✔✔Base or binder course that have larger nominal size
|| || || || || || || || || || || || || ||
aggregates. Low water impermeability, strength and improves freeze/thaw cycles
|| || || || || || || ||
Existing surface preparation inspection: Structurally Sound - ✔✔Cracks and other structural
|| || || || || || || || || || ||
defects must be prepared to minimize reflective cracking. surface must be non-compressible and
|| || || || || || || || || || || || ||
capable of bearing traffic loads
|| || || ||
Existing surface preparation: Well Drained - ✔✔1. Surface must not be undermined by water
|| || || || || || || || || || || || || ||
intrusion. ||
2. Water should not collect around roadbed
|| || || || || ||
3. Roadbed should promote positive drainage
|| || || || ||
Existing Surface Preparation: Properly Graded - ✔✔Elevation prepared to proper slope and
|| || || || || || || || || || || ||
crown