WGU C722 – PROJECT MANAGEMENT | OBJECTIVE ASSESSMENT (OA) – ACTUAL EXAM | 200 QUESTIONS AND ANSWERS | 2026 UPDATE | WITH COMPLETE SOLUTION

Instelling
Vak

Voorbeeld van de inhoud

WGU C722 – PROJECT MANAGEMENT | OBJECTIVE
ASSESSMENT (OA) – ACTUAL EXAM | 200 QUESTIONS
AND ANSWERS | 2026 UPDATE | WITH COMPLETE
SOLUTION




WGU C722 – Project Management



Question 1 (Provided)

The person in the project organization who has authority to expend resources for projects is the:

A. Project team
B. Project manager
C. Production supervisor
D. Project sponsor

✅ Correct Answer: D. Project sponsor

Rationale:
The project sponsor is the individual with the formal authority to allocate and approve organizational
resources for a project. Sponsors provide executive-level support, remove organizational barriers,
and authorize funding. While the project manager manages day-to-day execution, they typically do
not control budgets independently. The sponsor ensures the project aligns with strategic objectives
and has sufficient resources to proceed.



Question 2

Which document formally authorizes the existence of a project?

A. Project management plan
B. Scope statement
C. Project charter
D. Work breakdown structure

✅ Correct Answer: C. Project charter

Rationale:
The project charter formally authorizes a project and grants the project manager authority to apply
organizational resources. It defines high-level objectives, stakeholders, and constraints. Without an

,approved charter, a project lacks legitimacy within the organization. This document is created during
project initiation.



Question 3

Which knowledge area focuses on identifying, analyzing, and responding to project risks?

A. Quality management
B. Risk management
C. Procurement management
D. Integration management

✅ Correct Answer: B. Risk management

Rationale:
Risk management involves identifying potential threats and opportunities that could affect project
outcomes. It includes qualitative and quantitative analysis as well as response planning. Proactive
risk management improves the likelihood of project success. Other knowledge areas may address
risk indirectly but not comprehensively.



Question 4

What is the primary purpose of a Work Breakdown Structure (WBS)?

A. Assign project roles
B. Define communication channels
C. Decompose deliverables into manageable components
D. Estimate project risks

✅ Correct Answer: C. Decompose deliverables into manageable components

Rationale:
The WBS breaks project deliverables into smaller, manageable work packages. This decomposition
improves estimating accuracy, scheduling, and accountability. It serves as the foundation for cost,
schedule, and resource planning. A well-constructed WBS reduces scope ambiguity.



Question 5

Which project constraint refers to the amount of money available?

A. Scope
B. Schedule
C. Cost
D. Quality

✅ Correct Answer: C. Cost

Rationale:
Cost represents the financial resources allocated to the project. It includes labor, materials,

,equipment, and contingency reserves. Managing cost effectively ensures the project stays within
budget. Cost is one of the classic “triple constraints” along with scope and schedule.



Question 6

Which leadership style is most effective when the project team is highly skilled and self-motivated?

A. Autocratic
B. Laissez-faire
C. Transactional
D. Directive

✅ Correct Answer: B. Laissez-faire

Rationale:
Laissez-faire leadership allows team members autonomy and decision-making freedom. This style
works best when the team is experienced and capable of self-management. Over-controlling such
teams can reduce morale and productivity. The project manager focuses on support rather than
control.



Question 7

Which document defines how changes to the project will be evaluated and approved?

A. Risk register
B. Change management plan
C. Communications plan
D. Stakeholder register

✅ Correct Answer: B. Change management plan

Rationale:
The change management plan establishes procedures for submitting, reviewing, and approving
project changes. It ensures that changes are assessed for impact on scope, cost, and schedule. This
helps prevent scope creep and maintains project control. Formal change processes protect project
integrity.



Question 8

What is the main purpose of stakeholder analysis?

A. Reduce project costs
B. Identify training needs
C. Understand stakeholder influence and expectations
D. Create the project schedule

✅ Correct Answer: C. Understand stakeholder influence and expectations

Rationale:
Stakeholder analysis identifies stakeholders and evaluates their interests, power, and influence.

, Understanding expectations helps the project manager tailor communication and engagement
strategies. Effective stakeholder management reduces resistance and increases project support. This
process begins early and continues throughout the project.



Question 9

Which scheduling technique identifies the longest path of dependent tasks?

A. Gantt chart
B. Critical Path Method (CPM)
C. PERT
D. Kanban

✅ Correct Answer: B. Critical Path Method (CPM)

Rationale:
CPM determines the sequence of tasks that directly affects the project’s completion date. Any delay
on the critical path delays the entire project. This technique helps prioritize activities and allocate
resources efficiently. CPM is widely used in traditional project scheduling.



Question 10

What does “scope creep” refer to?

A. Cost overruns
B. Schedule compression
C. Uncontrolled expansion of project scope
D. Risk escalation

✅ Correct Answer: C. Uncontrolled expansion of project scope

Rationale:
Scope creep occurs when additional features or requirements are added without formal approval. It
often results from poor requirements definition or weak change control. Scope creep can negatively
affect cost, schedule, and quality. Strong scope management prevents this issue.



Question 11

Which process group focuses on monitoring performance and making adjustments?

A. Initiating
B. Planning
C. Executing
D. Monitoring and Controlling

✅ Correct Answer: D. Monitoring and Controlling

Rationale:
This process group tracks, reviews, and regulates project progress. It ensures objectives are met and

Geschreven voor

Instelling
Vak

Documentinformatie

Geüpload op
4 januari 2026
Aantal pagina's
63
Geschreven in
2025/2026
Type
OVERIG
Persoon
Onbekend

Onderwerpen

$28.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
EvaTee Phoenix University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
5286
Lid sinds
4 jaar
Aantal volgers
3570
Documenten
56770
Laatst verkocht
22 uur geleden
TIGHT DEADLINE? I CAN HELP

Many students don\'t have the time to work on their academic papers due to balancing with other responsibilities, for example, part-time work. I can relate. kindly don\'t hesitate to contact me, my study guides, notes and exams or test banks, are 100% graded

3.8

963 beoordelingen

5
458
4
169
3
176
2
48
1
112

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen