Six Dials of Project Scope Ans: -cost
-time
-quality
-safety
-scope
-function
Three-legged-stool Ans: -time
-cost
-quality
Design-bid-build Ans: Traditional project delivery
method
-owner holds two separate contracts for design and build
Agency CM Ans: Cons. Manager acts on the owners best
interest but is not financially responsible
GMP Ans: Guaranteed Maximum Price
© 2025 All rights reserved
, 2 | Page
Multiple Prime Ans: Contracting method where the owner
bypasses a General Contractor and enters into multiple
contracts with contractors
Design-build Ans: Newer delivery method where there is
only 1 contract between the owner and Design/Builder.
Design/Builder is responsible for both ends.
Fast-tracking Ans: a practice utilized to speed up job by
overlapping the design and construction phrase.
IPD Ans: Integrated Project Delivery
In what time period was the concept of a Theoretical
Architect developed? Ans: The Renaissance
When was concrete first used? Ans: During the Roman
Empire
What is an individual responsible for the design,
engineering, and construction of a project? Ans: Master
builder
How is the Code of Hammurabi important to
construction? Ans: First known recorded building code.
What were some of the changes in building materials that
contributed to growth of the building industry in the late
1880's? Ans: Steel framing replaced iron framing,
invention of Portland Cement and reinforcing, mass
production of glass, and the invention of the passenger
elevator.