Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

2026 NICET Highway Construction Inspector Level iii Practice Test Update Correctly Answered Graded Pass

Beoordeling
-
Verkocht
-
Pagina's
14
Cijfer
A+
Geüpload op
08-01-2026
Geschreven in
2025/2026

2026 NICET Highway Construction Inspector Level iii Practice Test Update Correctly Answered Graded Pass

Instelling
NICET Highway Construction Inspector Level Iii
Vak
NICET Highway Construction Inspector Level iii

Voorbeeld van de inhoud

2026 NICET Highway Construction Inspector
Level iii Practice Test Update Correctly
Answered Graded Pass
A failed sloped is regraded to help stabilize the slope. What is the main purpose of the regrading?

a) add fill at the top of the slope
b) reduce concentrated flow
c) remove soil at the top of the slope
d) remove vegetation

b) reduce concentrated flow

When can pre-stressed concrete beams be transported to the jobsite?

a) after concrete has attained the minimum required design strength and is at least 7 days old
b) after concrete has attained the minimum required design strength and is at least 14 days old
c) after concrete has attained the minimum required design strength and is at least 21 days old
d) after concrete has attained the minimum required design strength and is at least 28 days old

a) after concrete has attained the minimum required design strength and is at least 7 days old

How soon after installation may anchor rods be subjected to service loads?

a) when concrete reaches 14-day specified strength
b) when concrete reaches 28-day specified strength
c) when concrete reaches 50% of its 28-day specified strength
d) when concrete reaches 75% of its 28-day specified strength

b) when concrete reaches 28-day specified strength

The invert of the sewer drops 1.2 feet in a horizontal distance of 250 feet. What is the slope?

a) 0.0048%
b) 0.040%
c) 0.40%
d) 0.48%

d) 0.48%

, Driven falsework piles shall be removed if they are less than how many inches below subgrade with a
roadbed?

a) 11 inches
b) 15 inches
c) 24 inches
d) 28 inches

a) 11 inches

The contractor proposes to place concrete for a drilled shaft per the dry method. Prior to concrete
placement, the contractor attempts to pump out any water from the drilled shaft but has an inflow of
groundwater at a rate greater than 12 inches per hour. Which of the following is the proper procedure
under this circumstance?

a) add additional cement to concrete mix to maintain the proposed water-cement ratio.
b) Continue pumping out ground water in shaft during concrete placement.
c) Drill shaft deeper to accommodate the excess groundwater and place concrete.
d) Flood shaft and place concrete per wet method.

d) Flood shaft and place concrete per wet method.



During installation of traffic loops in the pavement, which three statements apply prior to and during
the installation of loop wire? (Choose 3).

a) Do not allow vehicular traffic over an open saw cut.
b) Do not overlap saw cuts at the corner.
c) Thoroughly clean the saw cut of foreign material.
d) Use a plastic sleeve where loop wire crosses a joint.

a) Do not allow vehicular traffic over an open saw cut.
c) Thoroughly clean the saw cut of foreign material.
d) Use a plastic sleeve where loop wire crosses a joint.

What are three possible acceptance methods for PVC pipeline used for sewers? (Choose 3)

a) bacteria
b) deflection
c) leakage
d) visual inspection

b) deflection
c) leakage
d) visual inspection

Geschreven voor

Instelling
NICET Highway Construction Inspector Level iii
Vak
NICET Highway Construction Inspector Level iii

Documentinformatie

Geüpload op
8 januari 2026
Aantal pagina's
14
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$24.50
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
NURSMERIT West Coast University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1520
Lid sinds
4 jaar
Aantal volgers
762
Documenten
3022
Laatst verkocht
6 dagen geleden
NURSMERIT

Let’s make academic success your reality

4.0

345 beoordelingen

5
181
4
79
3
35
2
11
1
39

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen