Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

ACI Concrete Strength Testing Technician Questions and Verified Answers. Edition Rated A

Rating
-
Sold
-
Pages
34
Grade
A
Uploaded on
08-01-2026
Written in
2025/2026

ACI Concrete Strength Testing Technician Questions and Verified Answers, 2026–2027 Edition, is a comprehensive resource covering key concepts, procedures, and standards for concrete strength testing. It features well-organized questions with verified, correct answers to support effective learning and mastery. Rated A, this material serves as a reliable study and review tool for students and professionals seeking to strengthen their knowledge and excel in the ACI Concrete Strength Testing Technician certification.

Show more Read less
Institution
Aci Concrete
Course
Aci concrete

Content preview

1




ACI Concrete Strength Testing
Technician Questions and Verified
Answers. 2026-2027 Edition Rated A


_______ the pot and recharge with fresh materials at intervals to ensure
that the oldest material in the pot has not been used more than _______
times. - ANSempty, five


C39/M: Cylinder Testing


After all surfaces are wiped down, what is next? - ANSPlace the specimen
on the lower bearing block, and align under the center of thrust of the upper
bearing block.


C39/M: Cylinder Testing


After the lower bearing block is positioned, what is the next step? -
ANSWipe clean the surfaces of the platens, spacer disks, and bearing
surfaces of the specimen.


C39/M: Cylinder Testing


From when is the age of a specimen measured? What are the tolerances
for specimens of 1, 3, 7, 28, and 98 days of age? - ANSThe time of casting,
unless otherwise specified.

1

, 2




- 1 days: +/- 0.5 hours
- 3 days: +/- 2 hours
- 7 days: +/- 6 hours
- 28 days: +/- 20 hours
- 90 days: +/- 48 hours


C39/M: Cylinder Testing


The initial load has been applied in a test with unbonded caps. What is to
be done next? - ANSCheck the alignment of the specimen at two locations
90° apart, making sure alignment is with respect to the direction of load
application is within:


- 0.5°
- 1/8in per 12in (3mm per 300mm)
- 1/12in per 8in (2mm per 200mm)


If off, reload and check again.


C39/M: Cylinder Testing


The machine has been zeroed, the initial load has been applied, and any
necessary alignment checks have been made. How should they load be
applied? - ANSContinuously and without shock.


35 +/- 7 psi/second (0.25 +/- 0.05 MPa/sec)

2

, 3




For the first half of anticipated loading, machine may be advanced at a
higher rate. This is not mandatory.


The specified loading rate shall be maintained for at least the second half
of the loading phase.


Once yielding had begun, indicated by a drop in the loading rate, no further
adjustments are allowed.


C39/M: Cylinder Testing


The machine has been zeroed. If using unbound caps, what is the next
step? - ANSApply an initial load of less than 10% of the anticipated load
and pause the machine.


C39/M: Cylinder Testing


The specimen has been placed in the machine. What is the next step? -
ANSZero the machine.


C39/M: Cylinder Testing


What is the first step of the procedure? - ANSPlace the lower bearing block
on the machine or platen with the hardened face up.


The lower bearing block may be the platen in the machine.

3

, 4




C617/M: Gypsum Cement


After lowering the specimen into the paste, what is the next step? -
ANSAllow the gypsum paste to harden. This may take 20 minutes or more.


C617/M: Gypsum Cement


After mixing paste, what is the next step? - ANSUse any capping surface:
glass (1/4in, 6mm), metal (0.45in, 11mm), or stone/diabase (3in, 75mm).
Lightly oil capping surface.


C617/M: Gypsum Cement


What is step 1? - ANSMix gypsum cement paste to desired w/c ratio. DO
NOT EXCEED W/C ESTABLISHED FROM CUBE STRENGTH TESTS.


C617/M: Gypsum Cement


What is the next step after the gypsum paste hardens? - ANSRepeat the
procedure for the other end of the specimen.


C617/M: Gypsum Cement


What is to be done after the paste is poured onto the capping plate? -
ANSCarefully lower the specimen into the gypsum paste. Use guide bars or
a bulls-eye level to ensure perpendicularity to within:

4

Written for

Institution
Aci concrete
Course
Aci concrete

Document information

Uploaded on
January 8, 2026
Number of pages
34
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$16.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
wilfredmburuUS

Get to know the seller

Seller avatar
wilfredmburuUS Johns Hopkins University School Of Nursing
Follow You need to be logged in order to follow users or courses
Sold
8
Member since
2 year
Number of followers
0
Documents
1213
Last sold
3 weeks ago
Grade A+ Assignments, Exams, Quizzes, and Homework

EXCELLENT ASSIGNMENT AND EXERCISES HELP & TUTORING, ALL KINDS OF QUIZS & EXAMS WITH A GUARANTEED GRADE A. I am an expert on major courses especially; Human Resource Management, Criminal Justice, Criminology, Nursing, Sociology, Data Science, Environmental Science, Management Leadership and Forensics ensuring quality work delivery. I maintain scholarly standards in all my work, ensuring students get the best from me. I assure you a GOOD GRADE if you will use my work.

Read more Read less
0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions