Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

FDOT Final Estimates - Level 2 Questions & answers 2025/2026

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
12-01-2026
Written in
2025/2026

FDOT Final Estimates - Level 2 Questions & answers 2025/2026 1. Under the current Specifications for Lump Sum Projects, the Project Administrator will approve and pay the Final Estimate? - ANSWER False 2. Surge protection devices are under? - ANSWER Grounding and lighting protection, Section 620 of the Specifications. 3. As items in the feild are completed,within 30 days, you will need to have the supporting documentation available to support the pay item in the? - ANSWER Plan Summary Boxes 4. Using the current Specifications and the attached Summary Tables, what is the pay quantity for this steel test pile? ( 60' Authorized pipe length) - ANSWER 60' 5. The contractor has to request to work during the holiday in order to receive a Holiday extension if the holiday falls within his normal workweek schedule? - ANSWER False 6. Determine the pay area (SY) and pay adjustment (SY) for Superpave Asphalt Base (Pay Item 285) based on the information provided below. The maximum pay is not to exceed 105%? - ANSWER Planned Qty 40,000 Thickness 6" - two layers 3" each spread rate 43.3 x 2.540 x 6= 600lbs SY = 300 LBS/SYper layer avg weighted Gmm = 2580 Actual Tonnage = 13607.4 Answer = pay area= 40,595 SY Pay Adjustment +595 SY 7. If a contractor does not request to work during a holiday, he automatically qualifies for Holiday Extension if that holiday falls within a normal workweek schedule? - ANSWER True 8. Which one of the following resources can be used for determining payment for conventional contracts? - ANSWER A)Standard Specifications B) Basis of Estimates Manual C) Construction Project Administration Manual ALL OF THE ABOVE 9. What is the correct way to fill in the Plan Sumary Boxes? - ANSWER A) If no change, use a red check mark, if there are changes, strike through the plan quantity and fill out the final quantity. Earthwork Survey/ Cross Sections Waiver form is used on the following projects? - ANSWER A) Milling and resurfacing projects where shoulder elevation does not change. B) Projects that involve only earthwork around box culvert extensions. C) Projects that involve restoring eroded sections.

Show more Read less
Institution
FDOT Estimates
Course
FDOT Estimates

Content preview

FDOT Final EsTimaTEs - lEvEl 2 QuEsTiOns &
answErs 2025/2026


1. Under the current Specifications for Lump Sum Projects, the Project
Administrator will approve and pay the Final Estimate? - ANSWER False



2. Surge protection devices are under? - ANSWER Grounding and lighting
protection, Section 620 of the Specifications.



3. As items in the feild are completed,within 30 days, you will need to have the
supporting documentation available to support the pay item in the? -
ANSWER Plan Summary Boxes



4. Using the current Specifications and the attached Summary Tables, what is
the pay quantity for this steel test pile? ( 60' Authorized pipe length) -
ANSWER 60'



5. The contractor has to request to work during the holiday in order to receive a
Holiday extension if the holiday falls within his normal workweek schedule?
- ANSWER False



6. Determine the pay area (SY) and pay adjustment (SY) for Superpave
Asphalt Base (Pay Item 285) based on the information provided below. The
maximum pay is not to exceed 105%? - ANSWER Planned Qty 40,000
Thickness 6" - two layers 3" each

, spread rate 43.3 x 2.540 x 6= 600lbs SY = 300 LBS/SYper layer
avg weighted Gmm = 2580
Actual Tonnage = 13607.4



Answer = pay area= 40,595 SY Pay Adjustment +595 SY



7. If a contractor does not request to work during a holiday, he automatically
qualifies for Holiday Extension if that holiday falls within a normal
workweek schedule? - ANSWER True



8. Which one of the following resources can be used for determining payment
for conventional contracts? - ANSWER

A)Standard Specifications
B) Basis of Estimates Manual
C) Construction Project Administration Manual
ALL OF THE ABOVE



9. What is the correct way to fill in the Plan Sumary Boxes? - ANSWER A) If
no change, use a red check mark, if there are changes, strike through the plan
quantity and fill out the final quantity.



Earthwork Survey/ Cross Sections Waiver form is used on the following projects? -
ANSWER A) Milling and resurfacing projects where shoulder elevation does not
change.

B) Projects that involve only earthwork around box culvert extensions.

C) Projects that involve restoring eroded sections.

Written for

Institution
FDOT Estimates
Course
FDOT Estimates

Document information

Uploaded on
January 12, 2026
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$9.89
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
Tutorpatrick
1.0
(1)

Also available in package deal

Get to know the seller

Seller avatar
Tutorpatrick Teachme2-tutor
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
5 months
Number of followers
0
Documents
120
Last sold
4 months ago
Tutor Patrick – Academic Excellence Hub

Welcome to my store! I provide high-quality, well-organized, and exam-focused study materials designed to help students achieve top grades. My resources include revision notes, exam questions with verified answers, study guides, and practice materials across multiple subjects such as Nursing, Psychology, Biology, Business, and Mathematics. All documents are carefully prepared, up-to-date, and aligned with current curricula and exam standards. Customer satisfaction and academic success are my priorities, and I am always committed to delivering clear, reliable, and value-packed study resources.

Read more Read less
1.0

1 reviews

5
0
4
0
3
0
2
0
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions