Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

C722- Project Management, WGU C722 (Pre), WGU C722 Project Management Terminology, WGU C722 Project Management Terminology, WGU C722 Equations Exam Questions And Answers

Beoordeling
-
Verkocht
-
Pagina's
69
Cijfer
A+
Geüpload op
14-01-2026
Geschreven in
2025/2026

C722- Project Management, WGU C722 (Pre), WGU C722 Project Management Terminology, WGU C722 Project Management Terminology, WGU C722 Equations Exam Questions And Answers What is a disadvantage of using this checklist approach? - ANSWER -Biases have not been eliminated. To calculate money's worth today compared to in the future - ANSWER -Time value of money To calculate future cash flows using time and interest rate - ANSWER -Internal rate of return To calculate whether revenue tomorrow is greater than costs today - ANSWER Net present value To calculate the alternative use of money - ANSWER -Opportunity cost What is the time value of money? - ANSWER -The concept that a dollar today is worth a dollar, but a dollar in a year will be worth less than a dollar What is internal rate of return? - ANSWER -The discount amount when present value of cash intake equals the original investment Which two processes are considered iterative processes? - ANSWER -(1) Planning (2) Executing Which activity is accomplished as part of the planning process of a project? - ANSWER -Finalizing the project budget Which activity is accomplished as part of the planning process of a project? - ANSWER -Finalizing the project schedule Which activity is accomplished during the closing process of a project? - ANSWER -Reconciling the vendor accounts Which activity is performed during the creating part of the initiating process? - ANSWER -Drafting the project charter Which activity is accomplished as part of the executing process of a project? - ANSWER -Implementing the project plan Which process involves determining who the project's stakeholders are? - ANSWER -The initiating process What information does this resource histogram display that can help during the planning phase of the project? - ANSWER -Opportunities to level resource usage patterns Which tool could a project manager use to ensure that the project team will address the items that are important when developing and defining the project's scope? - ANSWER -Checklist A project manager wants to understand and document the approvals that must be obtained for each work package in the work breakdown structure (WBS). Which tools document the approval requirements for each work package? - ANSWER -(1) Project statement of work (SOW) (2) Requirements traceability matrix (RAM) The general manager of a hotel has asked for a project to put in new landscaping around the building. The project manager has constructed a high-level work breakdown structure (WBS) for the project, which is provided below. WBS ID Description 1.0 Landscaping 1.1 Plans 1.2 Site preparation 1.3 Sprinklers 1.4 Sidewalks and curbing 1.5 Planting Which activity would it be logical to add to the approved high-level WBS to provide more detail on the work to be accomplished? - ANSWER -1.5.1 Lay sod A state college is launching a library building project. The project manager has constructed a work breakdown structure (WBS) for the project. A few elements from the WBS are shown in the table below (the WBS ID numbers and indentations of the descriptions are intentionally omitted). WBS ID Description ? Library project ? Facility needs ? Academic plan ? Stakeholder input ? Building proposal ? Siting ? Fundraising ? Potential donor list ? U.S. donors ? Florida donors Which two WBS elements of this project are on the same level as each other?

Meer zien Lees minder
Instelling
C722- Project Management, WGU C722 , WGU C72
Vak
C722- Project Management, WGU C722 , WGU C72

Voorbeeld van de inhoud

C722- Project Management, WGU C722
(Pre), WGU C722 Project Management
Terminology, WGU C722 Project
Management Terminology, WGU C722
Equations Exam Questions And
Answers
What is a disadvantage of using this checklist approach? - ANSWER -Biases have
not been eliminated.

To calculate money's worth today compared to in the future - ANSWER -Time
value of money

To calculate future cash flows using time and interest rate - ANSWER -Internal
rate of return

To calculate whether revenue tomorrow is greater than costs today - ANSWER -
Net present value

To calculate the alternative use of money - ANSWER -Opportunity cost

What is the time value of money? - ANSWER -The concept that a dollar today is
worth a dollar, but a dollar in a year will be worth less than a dollar

What is internal rate of return? - ANSWER -The discount amount when present
value of cash intake equals the original investment

Which two processes are considered iterative processes? - ANSWER -(1) Planning
(2) Executing

Which activity is accomplished as part of the planning process of a project? -
ANSWER -Finalizing the project budget

,Which activity is accomplished as part of the planning process of a project? -
ANSWER -Finalizing the project schedule

Which activity is accomplished during the closing process of a project? -
ANSWER -Reconciling the vendor accounts

Which activity is performed during the creating part of the initiating process? -
ANSWER -Drafting the project charter

Which activity is accomplished as part of the executing process of a project? -
ANSWER -Implementing the project plan

Which process involves determining who the project's stakeholders are? -
ANSWER -The initiating process

What information does this resource histogram display that can help during the
planning phase of the project? - ANSWER -Opportunities to level resource usage
patterns

Which tool could a project manager use to ensure that the project team will
address the items that are important when developing and defining the project's
scope? - ANSWER -Checklist

A project manager wants to understand and document the approvals that must be
obtained for each work package in the work breakdown structure (WBS).

Which tools document the approval requirements for each work package? -
ANSWER -(1) Project statement of work (SOW) (2) Requirements traceability
matrix (RAM)

The general manager of a hotel has asked for a project to put in new landscaping
around the building. The project manager has constructed a high-level work
breakdown structure (WBS) for the project, which is provided below.

,WBS ID Description
1.0 Landscaping
1.1 Plans
1.2 Site preparation
1.3 Sprinklers
1.4 Sidewalks and curbing
1.5 Planting
Which activity would it be logical to add to the approved high-level WBS to
provide more detail on the work to be accomplished? - ANSWER -1.5.1 Lay sod

A state college is launching a library building project. The project manager has
constructed a work breakdown structure (WBS) for the project. A few elements
from the WBS are shown in the table below (the WBS ID numbers and
indentations of the descriptions are intentionally omitted).

WBS ID Description
? Library project
? Facility needs
? Academic plan
? Stakeholder input
? Building proposal
? Siting
? Fundraising
? Potential donor list
? U.S. donors
? Florida donors
Which two WBS elements of this project are on the same level as each other?

Choose 2 ANSWERs - ANSWER -(1) Building proposal (2) Fundraising

The World Fabrication Corporation is launching a project that calls for the heavy
use of copper-clad bolts. The cost of these bolts fluctuates daily and it is difficult to
estimate the project cost over several weekly purchases of bolts. The threat of cost
increases is highly probable with a potentially significant budget impact. The

, company has decided to contract with the supplier to buy the bolts at a fixed price
for the expected duration of the project.

What risk response strategy is World Fabrication Corporation using? - ANSWER -
Risk Avoidance

Consolidated Systems, Inc. is initiating a project to develop a new Inventory
system with a specific system launch date and fixed budget. The company had
planned to use a software development tool it has used for past projects but is now
considering instead using new state-of-art software that has the potential to speed
development. The available staff is familiar with the old software development
tool.

What can the company do to avoid the risk of project delays? - ANSWER -
Continue using the old software tool

Bantam Electronics, a leader in mobile communications, has fallen behind in
technology. Competitors have introduced products using the latest technology.
Resources with expertise in this technology are scarce since there are very few
universities offering training in the technology. Bantam's market share has fallen
from 70 % to under 50%.

What can Bantam do to mitigate the risk of losing further ground in technology? -
ANSWER -Hire technical staff from the competition

What are the three categories of risk in the project risk register? - ANSWER -
External, technical, or organizational

A project manager is creating a list of anticipated project tasks while building a
calendarized budget.

What is the key component of this budget called? - ANSWER -Activity estimates

A project manager has identified activities in a calendarized budget.

Geschreven voor

Instelling
C722- Project Management, WGU C722 , WGU C72
Vak
C722- Project Management, WGU C722 , WGU C72

Documentinformatie

Geüpload op
14 januari 2026
Aantal pagina's
69
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$14.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
TheExamMaestro Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
144
Lid sinds
2 jaar
Aantal volgers
5
Documenten
3394
Laatst verkocht
1 week geleden
STA

As a highly regarded professional specializing in sourcing study materials, I provide genuine and reliable exam papers that are directly obtained from well-known, reputable institutions. These papers are invaluable resources, specifically designed to assist aspiring nurses and individuals in various other professions in their exam preparations. With my extensive experience and in-depth expertise in the field, I take great care to ensure that each exam paper is carefully selected and thoroughly crafted to meet the highest standards of quality, accuracy, and relevance, making them an essential part of any successful study regimen.

Lees meer Lees minder
3.6

18 beoordelingen

5
9
4
2
3
2
2
0
1
5

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen