Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

MGMT 404 - Week 2 Study Guide Questions and Verified Answers

Beoordeling
-
Verkocht
-
Pagina's
9
Cijfer
A+
Geüpload op
15-01-2026
Geschreven in
2025/2026

MGMT 404 - Week 2 Study Guide Questions and Verified Answers

Instelling
MGMT 404
Vak
MGMT 404

Voorbeeld van de inhoud

MGMT 404 - Week 2 Study Guide Questions and
Verified Answers
What is a disadvantage of assigning core team members and subject matter experts
(SME) to a project as early as possible? Correct Answer: If highly experienced
people are brought in before they are needed to complete project activities, this can
be expensive

The ideal time to bring core team members and even a few SMEs on-board is
__________. Correct Answer: When the project charter is being written

In which stage of team development do team members jockey for power, ask many
questions, and establish dubious goals? Correct Answer: Storming

In which stage of team development is the project manager's strategy to personalize
each member's role, collaborate when possible, and assess and build members' and
team's capability? Correct Answer: Norming

Project managers need to use various types of power to encourage people to
perform. When they persuade others based on their own knowledge and skills,
what type of power are they using? Correct Answer: Expert

A variety of outcomes may result from managing the project team. Poor appraisals,
insufficient progress, conflict, necessary reassignments, or other causes may warrant
___________on a project. Correct Answer: Staff changes

An experienced project manager took over a troubled project that had serious
performance and morale issues. The PM called the team together and stressed that
all team members should keep each other informed, demonstrate that they value
each other's input, share feelings, and respect confidentiality. With these new
group norms, the project manager was establishing ________ between team
members. Correct Answer: Open and transparent communications

The project manager and the core team need to determine who will make which
types of project decisions. Some may be made by the sponsor, functional manager,

, core team, etc. Which of these is NOT a valid guide to decision making on projects?
Correct Answer: Sponsor decides to ensure buy-in from all participants

All of these are typical relationship sources of conflict EXCEPT: Correct Answer:
Technical approach

This style of conflict resolution is preferred when the issue is important for both
sides, and buy-in is needed. Correct Answer: Collaborating/problem solving

All of these are indications that a team is operating in a virtual mode, EXCEPT:
Correct Answer: Face-to-face communication is used

Managing a virtual project team presents increased challenges. Which of these
pairings of project management needs with the associated challenges of a global,
virtual project is NOT correct? Correct Answer: Control issues—with less group
interaction, easy to identify

During the project, stakeholders change in their interest and influence toward the
project. The project team should seek to understand project stakeholders by
analyzing all of the factors below EXCEPT: Correct Answer: Servant leadership

Which of these is NOT one of the activities that would be performed as part of the
PMBOK 7e Delivery Domain? Correct Answer: Considering the effects of
uncertainty on the project

There are a number of differences between teams on traditional, plan-driven
projects vs. Agile projects. Which of these is NOT a characteristic of an Agile
project team? Correct Answer: Meeting scope, schedule, and cost agreements

Which of these is NOT one of the three common approaches to leadership that are
effective on Agile projects? Correct Answer: Situational leadership

Stakeholder analysis is a technique comprised of gathering and evaluating
information to determine whose interests should be emphasized throughout the
project. The first part of stakeholder analysis is to _____ the stakeholders. Correct
Answer: Prioritize

Geschreven voor

Instelling
MGMT 404
Vak
MGMT 404

Documentinformatie

Geüpload op
15 januari 2026
Aantal pagina's
9
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$13.49
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
Ivie Stuvia
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
31
Lid sinds
1 jaar
Aantal volgers
1
Documenten
8540
Laatst verkocht
4 dagen geleden

3.4

7 beoordelingen

5
2
4
2
3
1
2
1
1
1

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen