CSE360 FINAL REVIEW | VERIFIED STUDY | QUESTIONS
AND ANSWERS | 2026 UPDATES
Software deteriorates due to... - ANSWER- Changes that degrade the code structure,
changes that degrade the design, changes that potentially incorporate more bugs
What are the two broader categories of software products? - ANSWER- Generic products,
customized products
Which of the following is not a major software process activity? - ANSWER- Software
testing
During the lectures, we have discussed software engineering as a four layered technology...
which of the following belongs to the four layer technology? - ANSWER- Quality, process,
methods, tools
Which of the following is the UML modeling tool that is required we use in CSE360 - ANSWER-
Astah
According to the article "Software Engineering not CS", material cost of other engineering
products is about 50% compared to almost 100% labor cost in software engineering. Due to the
huge labor cost, software projects need to focus more on... - ANSWER- Small team size,
predictable delivery dates, short schedule
According to the article "Software Engineering not CS", a well-run software project can be
managed to meet which of the following product goals? - ANSWER- Good maintainability,
minimal defects, maintain a cohesive team
(T/F) Pair programming invented in XP promotes faster coding as two people are programming
the same module - ANSWER- False
(T/F) User stories in XP are developed by project managers - ANSWER- False
(T/F) In XP, new versions may be built several times per day... - ANSWER- True
(T/F) Scrums are daily meetings in the scrum process model - ANSWER- True
Which of the following are software main process activities? - ANSWER- Specification,
Design and implementation
, Which of the following statements is true about plan driven software process models? -
ANSWER- all of the process activities are planned in-advanced and progress is measured
against this plan, incremental process model is an example of a plan driven approach
Consider the following software project requirement and then select the best process model to
develop this software...
A software firm has just signed a contract to deliver an inventory tracking/on-line transaction
system for use by 500 entry clerks in the contract. The client has demanded a schedule of
rigorous checkpoints in each 30-40 days (evaluation of software functionality) but the major
requirements for the project are well defined and no major changes expected. - ANSWER-
Incremental process model
Which of the following is NOT a key principle in the agile manifesto - ANSWER- schedule
for each increment over the schedule for the whole project
Which of the following process model suggest increments in every 2 weeks - ANSWER- XP
What is the main functionality of the scrum master? - ANSWER- Communicates with
customers and management outside of the team
Which of the following is not a major process activity? - ANSWER- Developing use case
scenarios
Which of the following is an example of a non-functional requirement in a online shopping store
- ANSWER- Reliability, server memory capacity (availability)
Which of the following is not a major quality factor stated in the ISO 25010 Model? - ANSWER-
Speed
Suppose you, a project manager at a software company that has multiple customers, and you
are managing multiple projects concurrently. You would like to have specialized people for
major software engineering activities that you do in a software project. You need to decided a
good team structure for a company... what do you choose? - ANSWER- Matrix
Management
(T/F) Duration of the Sprint cycle in scrum process model is typically 24 hours - ANSWER-
False
(T/F) Scrums are product backlogs in the scrum process model - ANSWER- False
AND ANSWERS | 2026 UPDATES
Software deteriorates due to... - ANSWER- Changes that degrade the code structure,
changes that degrade the design, changes that potentially incorporate more bugs
What are the two broader categories of software products? - ANSWER- Generic products,
customized products
Which of the following is not a major software process activity? - ANSWER- Software
testing
During the lectures, we have discussed software engineering as a four layered technology...
which of the following belongs to the four layer technology? - ANSWER- Quality, process,
methods, tools
Which of the following is the UML modeling tool that is required we use in CSE360 - ANSWER-
Astah
According to the article "Software Engineering not CS", material cost of other engineering
products is about 50% compared to almost 100% labor cost in software engineering. Due to the
huge labor cost, software projects need to focus more on... - ANSWER- Small team size,
predictable delivery dates, short schedule
According to the article "Software Engineering not CS", a well-run software project can be
managed to meet which of the following product goals? - ANSWER- Good maintainability,
minimal defects, maintain a cohesive team
(T/F) Pair programming invented in XP promotes faster coding as two people are programming
the same module - ANSWER- False
(T/F) User stories in XP are developed by project managers - ANSWER- False
(T/F) In XP, new versions may be built several times per day... - ANSWER- True
(T/F) Scrums are daily meetings in the scrum process model - ANSWER- True
Which of the following are software main process activities? - ANSWER- Specification,
Design and implementation
, Which of the following statements is true about plan driven software process models? -
ANSWER- all of the process activities are planned in-advanced and progress is measured
against this plan, incremental process model is an example of a plan driven approach
Consider the following software project requirement and then select the best process model to
develop this software...
A software firm has just signed a contract to deliver an inventory tracking/on-line transaction
system for use by 500 entry clerks in the contract. The client has demanded a schedule of
rigorous checkpoints in each 30-40 days (evaluation of software functionality) but the major
requirements for the project are well defined and no major changes expected. - ANSWER-
Incremental process model
Which of the following is NOT a key principle in the agile manifesto - ANSWER- schedule
for each increment over the schedule for the whole project
Which of the following process model suggest increments in every 2 weeks - ANSWER- XP
What is the main functionality of the scrum master? - ANSWER- Communicates with
customers and management outside of the team
Which of the following is not a major process activity? - ANSWER- Developing use case
scenarios
Which of the following is an example of a non-functional requirement in a online shopping store
- ANSWER- Reliability, server memory capacity (availability)
Which of the following is not a major quality factor stated in the ISO 25010 Model? - ANSWER-
Speed
Suppose you, a project manager at a software company that has multiple customers, and you
are managing multiple projects concurrently. You would like to have specialized people for
major software engineering activities that you do in a software project. You need to decided a
good team structure for a company... what do you choose? - ANSWER- Matrix
Management
(T/F) Duration of the Sprint cycle in scrum process model is typically 24 hours - ANSWER-
False
(T/F) Scrums are product backlogs in the scrum process model - ANSWER- False