Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

MTDE 333 Final Exam (Quiz Questions) With Complete Solutions

Rating
-
Sold
-
Pages
12
Grade
A+
Uploaded on
19-01-2026
Written in
2025/2026

MTDE 333 Final Exam (Quiz Questions) With Complete Solutions ...

Institution
MTDE 333
Course
MTDE 333

Content preview

MTDE 333 Final Exam (Quiz Questions) With
Complete Solutions


In the PERT method, the Standard Deviation (σ ) of the project duration can be
calculated as: - ANSWER The SQRT of the sum of the Variances of critical activities




The Program Evaluation Review Technique (PERT) relies on the theorem known as .... to
incorporate uncertainty on the project duration. - ANSWER CLT




In project management, the variability of an activity duration can be represented as a
Probability Distribution Curve (T/F) - ANSWER True




The cost estimating method named "Cost Engineering" is also known as: - ANSWER
Detailed Cost Estimating




Which project life cycle phase would be more suitable for the "Analogy" cost estimating
method? - ANSWER Conception




As a project progresses

through its life cycle, its definition and cost estimate experience changes: - ANSWER
Level of Detail INCREASES / Accuracy INCREASES




The project below is at the end of week 12. What can be inferred about the project's

, performance based on the reported expense curve? (In the picture the current curve is
above the early start curve) - ANSWER The project is spending faster than planned




A project is entirely self-financed when both the net and maximum curves are below the
X-axis of the cashflow diagram (T/F) - ANSWER False




A project cost control account contains information from 2 management structures: -
ANSWER WBS & OBS




When a project manager delays payments to vendors and subcontractors is most likely
trying to: - ANSWER Improve the net cash flow of the project




A project's cost estimate, once approved, is called: - ANSWER Project's Budget




The lowest point in a cashflow diagram is called: - ANSWER Maximum Overdraft




During the risk identification phase, an aerospace design project's manager (PM) realizes
the fuselage material may not be reliable. What type of risk is the PM concerned about? -
ANSWER Project (Internal Source) - Technical Risk




What are the two main Cost of Quality (CoQ) categories? - ANSWER Cost of
Conformance and Cost of Non-conformance




Risk identification is a phase of Project Risk Management that estimates the impact and

Written for

Institution
MTDE 333
Course
MTDE 333

Document information

Uploaded on
January 19, 2026
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$14.49
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Zayla Liberty University
Follow You need to be logged in order to follow users or courses
Sold
115
Member since
3 year
Number of followers
13
Documents
14729
Last sold
4 hours ago

3.4

17 reviews

5
5
4
3
3
5
2
2
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions