ICA 2 PRELIM REVIEWER EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATE 2026/2027 Who can best interpret Architectural drawings? - Answers Architect Who should sign architectural drawings? - Answers Architect You were commissioned to do a Master Plan. What should you do first? - Answers Survey the location Responsibilities of an Architect: When He/She conducts the checking of materials and works done it it in adherence with the specifications - Answers Full time supervision How often does the Architect-of-record visit the job site? - Answers As often as he/she wants Specifications should be clear and easy to understand. What must be avoided? - Answers Sentence with double meaning The record tests of materials and of concrete must be preserved after the completion of the project for a t least? - Answers 5 years After a change of use (renovation)of the building, what should be secured? - Answers Certificate of occupancy A permit prior to the commencement of a project - Answers Building permit What are the qualifications of someone who wishes to take the licensure exam for architects? - Answers Filipino citizen, Graduate of Architecture, Submitted the necessary requirements to PRC, (ALL OF THE ABOVE) After how many days can a contractor stop work if the architect's approval for the change of work is delayed? - Answers 15 days An outline specification enumerating the type trade names of materials to be used and finishes is known as - Answers Schedule of materials and finishes Under PD 957 and BP 220, how many units shall be the maximum number of row houses per block/cluster? - Answers 20 Under BP 220, the maximum length of a block is 400 meters. However, Block lengths exceeding 250 meters should be provided with an alley approximately ay midlength. How wide is the alley? - Answers 2.00 meters Under BP 220. it shall have a width of 3.00 meters intended only to provide pedestrian access to property for socialized housing projects. It shall have a maximum length of 60 meters - Answers Pathwalk Under PD 957, what is the minimum lot frontage for row houses? - Answers 4 Under BP220, what is the minimum lot frontage for socialized row houses? - Answers 3.5 Meters Which of the following is not part of the RROW? - Answers Yard What is the minimum RROW access to an Interior lot? - Answers Verify Answer Space left in a lot between the building and the property line - Answers Yard For a RROW of 9.00 meters or more, the minimum width of the sidewalk on each side shall be? - Answers 1.2m As per PD 1096, what is the minimum horizontal dimension of a court? - Answers 2.00 m Minimum front setback for R-1 - Answers 4.50 m Minimum side setback for R-1 - Answers 2m Minimum rear setback for R-1 - Answers 2.00 m Using the 1977 National Building Code, what is the minimum setback for R-1 - Answers 3.0m What is the minimum front setback for R-4? - Answers 4.5 Meters What is the minimum ceiling height for Habitable Rooms with Artificial Ventilation of a single-storey structure? - Answers 2.4 Meters What is the minimum ceiling height for Habitable Rooms with Artificial Ventilation at the Second floor? - Answers 2.40m What is the minimum ceiling height at the ground floor for Habitable Rooms with Natural Ventilation? - Answers 2.70m Height of ceiling at 5th floor with Natural Ventilation? - Answers 2.7 Meters What is the minimum dimension of a Kitchen? - Answers 1.5 M x 2 M Width of Drop Curb? - Answers 0.90m Maximum height of Spire, if made of combustible material, above the BHL? - Answers 6 meters Maximum height of Spire, if made of incombustible material, above the BHL? - Answers Limited only by Structural Design Who prepares the Comprehensive Land Use of Plan? - Answers HLURB Who adopts the land use plan when it was already approved? - Answers Sangguniang Panglunsod Which will you least or NOT consider in making a Comprehensive Development Plan? - Answers Political/Institutional Which is NOT considered in a Master Development Plan? - Answers Building Height What is meant by R3 in residential zone? - Answers High Density Housing Specifications contain? - Answers Quality of Materials

Meer zien Lees minder
Instelling
ICA 2 PRELIM
Vak
ICA 2 PRELIM

Voorbeeld van de inhoud

ICA 2 PRELIM REVIEWER EXAM QUESTIONS WITH CORRECT ANSWERS LATEST UPDATE
2026/2027

Who can best interpret Architectural drawings? - Answers Architect

Who should sign architectural drawings? - Answers Architect

You were commissioned to do a Master Plan. What should you do first? - Answers Survey the
location

Responsibilities of an Architect: When He/She conducts the checking of materials and works
done it it in adherence with the specifications - Answers Full time supervision

How often does the Architect-of-record visit the job site? - Answers As often as he/she wants

Specifications should be clear and easy to understand. What must be avoided? - Answers
Sentence with double meaning

The record tests of materials and of concrete must be preserved after the completion of the
project for a t least? - Answers 5 years

After a change of use (renovation)of the building, what should be secured? - Answers Certificate
of occupancy

A permit prior to the commencement of a project - Answers Building permit

What are the qualifications of someone who wishes to take the licensure exam for architects? -
Answers Filipino citizen, Graduate of Architecture, Submitted the necessary requirements to
PRC, (ALL OF THE ABOVE)

After how many days can a contractor stop work if the architect's approval for the change of
work is delayed? - Answers 15 days

An outline specification enumerating the type trade names of materials to be used and finishes
is known as - Answers Schedule of materials and finishes

Under PD 957 and BP 220, how many units shall be the maximum number of row houses per
block/cluster? - Answers 20

Under BP 220, the maximum length of a block is 400 meters. However, Block lengths exceeding
250 meters should be provided with an alley approximately ay midlength. How wide is the alley?
- Answers 2.00 meters

Under BP 220. it shall have a width of 3.00 meters intended only to provide pedestrian access to
property for socialized housing projects. It shall have a maximum length of 60 meters - Answers
Pathwalk

,Under PD 957, what is the minimum lot frontage for row houses? - Answers 4

Under BP220, what is the minimum lot frontage for socialized row houses? - Answers 3.5
Meters

Which of the following is not part of the RROW? - Answers Yard

What is the minimum RROW access to an Interior lot? - Answers Verify Answer

Space left in a lot between the building and the property line - Answers Yard

For a RROW of 9.00 meters or more, the minimum width of the sidewalk on each side shall be? -
Answers 1.2m

As per PD 1096, what is the minimum horizontal dimension of a court? - Answers 2.00 m

Minimum front setback for R-1 - Answers 4.50 m

Minimum side setback for R-1 - Answers 2m

Minimum rear setback for R-1 - Answers 2.00 m

Using the 1977 National Building Code, what is the minimum setback for R-1 - Answers 3.0m

What is the minimum front setback for R-4? - Answers 4.5 Meters

What is the minimum ceiling height for Habitable Rooms with Artificial Ventilation of a single-
storey structure? - Answers 2.4 Meters

What is the minimum ceiling height for Habitable Rooms with Artificial Ventilation at the Second
floor? - Answers 2.40m

What is the minimum ceiling height at the ground floor for Habitable Rooms with Natural
Ventilation? - Answers 2.70m

Height of ceiling at 5th floor with Natural Ventilation? - Answers 2.7 Meters

What is the minimum dimension of a Kitchen? - Answers 1.5 M x 2 M

Width of Drop Curb? - Answers 0.90m

Maximum height of Spire, if made of combustible material, above the BHL? - Answers 6 meters

Maximum height of Spire, if made of incombustible material, above the BHL? - Answers Limited
only by Structural Design

Who prepares the Comprehensive Land Use of Plan? - Answers HLURB

Who adopts the land use plan when it was already approved? - Answers Sangguniang

, Panglunsod

Which will you least or NOT consider in making a Comprehensive Development Plan? - Answers
Political/Institutional

Which is NOT considered in a Master Development Plan? - Answers Building Height

What is meant by R3 in residential zone? - Answers High Density Housing

Specifications contain? - Answers Quality of Materials

What is the purpose of Bill of Materials? - Answers Reference on Cost

Who is responsible for making/ producing Architectural Drawings? - Answers Architect

What is not a Structural Plan? - Answers Schedule of beams

Basic function of an open door? - Answers Means of access

Allowable projection for the signage of a building that is NOT arcaded - Answers 1.20

Minimum signage height of a building that is NOT arcaded - Answers 3.0m

Minimum signage height of a building that is NOT arcaded - Answers 3.0m

Minimum signage height of a building that is arcaded - Answers 5 meters

The minimum arcade height above the established sidewalk grade is - Answers 3.0m

Allowable projection for the signage of a building that is arcaded - Answers 1.00

It is a bond that is an approved form of security furnished by the contractor as a guarantee to
execute work in accordance with the terms of the contract - Answers Performance Bond

In the construction industry, it is a person, firm or corporation that provides guarantee or
undertakes an obligation to pay in the event of failure on the part of the Contractor to fulfil his
part. - Answers Surety

In Specs writing, how do you refer to money? - Answers How much

When should Building Operations Manual (BOM) be submitted to the owner by the contractor? -
Answers 30 days after issuance of certificate of occupancy

Considering office space, what is the minimum clearance of a service zone so as not obstruct
walkways between 2 work units? - Answers 1 meter

Considering office space, what is the minimum width that will also serve as access from the
work unit to the wall? - Answers 1 meter

Geschreven voor

Instelling
ICA 2 PRELIM
Vak
ICA 2 PRELIM

Documentinformatie

Geüpload op
20 januari 2026
Aantal pagina's
16
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$10.89
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper

Seller avatar
De reputatie van een verkoper is gebaseerd op het aantal documenten dat iemand tegen betaling verkocht heeft en de beoordelingen die voor die items ontvangen zijn. Er zijn drie niveau’s te onderscheiden: brons, zilver en goud. Hoe beter de reputatie, hoe meer de kwaliteit van zijn of haar werk te vertrouwen is.
joshuawesonga22 Liberty University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
99
Lid sinds
1 jaar
Aantal volgers
1
Documenten
14163
Laatst verkocht
10 uur geleden
Tutor Wes

Hi there! I'm Tutor Wes, a dedicated tutor with a passion for sharing knowledge and helping others succeed academically. All my notes are carefully organized, detailed, and easy to understand. Whether you're preparing for exams, catching up on lectures, or looking for clear summaries, you'll find useful study materials here. Let’s succeed together!

3.9

9 beoordelingen

5
4
4
1
3
3
2
1
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen