SWPP Walmart Test questions with verified detailed answers || || || || || || ||
True or False? A labor laws placard must be posted. - ✔✔True
|| || || || || || || || || || ||
True or False? The GC shall ensure that all subcontractors and their workers have secured,
|| || || || || || || || || || || || || || ||
maintained, and complied with all required licenses, permits and certificates relating to, or
|| || || || || || || || || || || || ||
otherwise necessary or appropriate for, the performance and completion of the work and all
|| || || || || || || || || || || || || ||
other activities and obligations under the Contract Documents. - ✔✔True
|| || || || || || || || ||
Which of the following is required to be present at the job site?
|| || || || || || || || || || || || ||
A. Safety Manual and up to date MSDS binder
|| || || || || || || ||
B. SWPP certificate posted
|| || || ||
C. Visitors sign in book
|| || || ||
D. All of the Above - ✔✔All of the above
|| || || || || || || || ||
The SWPP implementation sequence may be modified? - ✔✔After consulting with the
|| || || || || || || || || || || ||
project SWPP Designer (CEC) and, if required, the Project Owner and receiving written
|| || || || || || || || || || || || ||
approval.
True or False: the GC doesn't need to worry about access control after possession. - ✔✔False
|| || || || || || || || || || || || || || ||
When installing perimeter BMP controls: - ✔✔Note locations and dates of installation on
|| || || || || || || || || || || || ||
the site map.
|| ||
A SWPP Site Map will show all of the following except:
|| || || || || || || || || ||
A. Locations of BMPs
|| || || ||
B. Notices of Violation
|| || ||
, 2
C. Phasing and Sequence
|| || || ||
D. Limits of Disturbance - ✔✔B. Notices of Violation C
|| || || || || || || || ||
In what circumstances must your company run newly hired employees through E-Verify? -
|| || || || || || || || || || || || ||
✔✔Any new hire employees who will provide services to Walmart in a mandatory E-Verify
|| || || || || || || || || || || || || ||
State: AL, AZ, GA, LA, MS, NC, SC, TN or UT.
|| || || || || || || || || ||
Factors to consider when creating your schedule include: - ✔✔Account for the time it takes
|| || || || || || || || || || || || || || ||
to install or implement BMP's between each phase of construction
|| || || || || || || || ||
Which of the following is not a silt fence related deficiency?
|| || || || || || || || || ||
A. Tears or holes in the fabric
|| || || || || ||
B. Excessive sediment accumulation
|| || || ||
C. Track out
|| || ||
D. Undercutting - ✔✔C. Trackout
|| || || ||
Requirements for managing stormwater activity on a construction site are outlined in the
|| || || || || || || || || || || || ||
following regulation: - ✔✔NPDES || || ||
True or False: Subcontractors do not need a GC badge during the first week of construction
|| || || || || || || || || || || || || || || ||
as this is the slowest time of the project. - ✔✔False
|| || || || || || || || || ||
Runoff Controls include all but which of the following:
|| || || || || || || ||
A. Rolled erosion control products
|| || || || ||
B. Diversions
||
C. Check dams
|| ||
D. Slope drains - ✔✔A. Rolled erosion control products
|| || || || || || || ||
SWPP Walmart Test questions with verified detailed answers || || || || || || ||
True or False? A labor laws placard must be posted. - ✔✔True
|| || || || || || || || || || ||
True or False? The GC shall ensure that all subcontractors and their workers have secured,
|| || || || || || || || || || || || || || ||
maintained, and complied with all required licenses, permits and certificates relating to, or
|| || || || || || || || || || || || ||
otherwise necessary or appropriate for, the performance and completion of the work and all
|| || || || || || || || || || || || || ||
other activities and obligations under the Contract Documents. - ✔✔True
|| || || || || || || || ||
Which of the following is required to be present at the job site?
|| || || || || || || || || || || || ||
A. Safety Manual and up to date MSDS binder
|| || || || || || || ||
B. SWPP certificate posted
|| || || ||
C. Visitors sign in book
|| || || ||
D. All of the Above - ✔✔All of the above
|| || || || || || || || ||
The SWPP implementation sequence may be modified? - ✔✔After consulting with the
|| || || || || || || || || || || ||
project SWPP Designer (CEC) and, if required, the Project Owner and receiving written
|| || || || || || || || || || || || ||
approval.
True or False: the GC doesn't need to worry about access control after possession. - ✔✔False
|| || || || || || || || || || || || || || ||
When installing perimeter BMP controls: - ✔✔Note locations and dates of installation on
|| || || || || || || || || || || || ||
the site map.
|| ||
A SWPP Site Map will show all of the following except:
|| || || || || || || || || ||
A. Locations of BMPs
|| || || ||
B. Notices of Violation
|| || ||
, 2
C. Phasing and Sequence
|| || || ||
D. Limits of Disturbance - ✔✔B. Notices of Violation C
|| || || || || || || || ||
In what circumstances must your company run newly hired employees through E-Verify? -
|| || || || || || || || || || || || ||
✔✔Any new hire employees who will provide services to Walmart in a mandatory E-Verify
|| || || || || || || || || || || || || ||
State: AL, AZ, GA, LA, MS, NC, SC, TN or UT.
|| || || || || || || || || ||
Factors to consider when creating your schedule include: - ✔✔Account for the time it takes
|| || || || || || || || || || || || || || ||
to install or implement BMP's between each phase of construction
|| || || || || || || || ||
Which of the following is not a silt fence related deficiency?
|| || || || || || || || || ||
A. Tears or holes in the fabric
|| || || || || ||
B. Excessive sediment accumulation
|| || || ||
C. Track out
|| || ||
D. Undercutting - ✔✔C. Trackout
|| || || ||
Requirements for managing stormwater activity on a construction site are outlined in the
|| || || || || || || || || || || || ||
following regulation: - ✔✔NPDES || || ||
True or False: Subcontractors do not need a GC badge during the first week of construction
|| || || || || || || || || || || || || || || ||
as this is the slowest time of the project. - ✔✔False
|| || || || || || || || || ||
Runoff Controls include all but which of the following:
|| || || || || || || ||
A. Rolled erosion control products
|| || || || ||
B. Diversions
||
C. Check dams
|| ||
D. Slope drains - ✔✔A. Rolled erosion control products
|| || || || || || || ||