Voltage ride through capability of the plant must be approved by correct answers ERCOT
Any resource or customer owned switching device that can interrupt flow 60kV/Greater must
have an agreement with _____ to schedule outages on correct answers TO
The resource entity representing a Non-Coordinated test must inform ERCOT and the TO ___
hours prior to the proposed start of the test correct answers 2
Lagging reactive tests should be performed during __ load periods correct answers High
Leading reactive tests should be performed during __ load periods correct answers Low
The ___ representing a generation resource shall be responsible for scheduling reactive
verification tests when requested by the resource entity correct answers QSE
Resource entity owners of transmission facilities shall provide to ___ all nominal transmission
facility ratings correct answers ERCOT
___ must notify ERCOT of any changes in its transmission facility status within ten seconds
correct answers TO
Each ___ shall have a vegetation management program outlining procedures to prevent
transmission line contact with vegetation correct answers Transmission Owner
The ERCOT LFC system shall deploy regulation service and __ __ energy service to provide
satisfactory frequency control correct answers Responsive Reserve
A __ __ shall immediately notify its QSE and its interconnecting TO of any change in AVR
correct answers Resource Entity
Combustion Turbine Max governor droop setting correct answers 4%
Response to a TO voltage set point instruction shall be completed in no more than ___ minutes
from receipt of the instruction correct answers 5
If the ERCOT transmission grid condition requires breaker or switch operation to disconnect a
NON MW producing generator, it shall be completed in no longer than ___ minutes correct
answers 15
The RRS obligation is a minimum of correct answers 2300 MW
Resource providing FFR can disconnect from the grid only after frequency has reached 60Hz and
PRC is above ___ correct answers 2500 MW