◉A shortage of steel has caused a delay in one of the tasks until the
material is available. The original plan estimated the material to be
available in 6 weeks, but the shortage continues. What would be an
appropriate step in tracking and managing this issue? 15.3 . Answer:
Adjust the corrective action plan and issue level as warranted.
◉Since risks should be closely tied to individual tasks and deliverables,
which of the following should be used as a cross-reference to each risk?
31.1 . Answer: Work Breakdown Structure (WBS) number
◉The following describes which type of category of risk: Two legacy
software systems must be combined into one system in order to operate
a new piece of hardware. Programmers must find a way to ensure that
old data records in each system are still editable. If not, the hardware
will not operate correctly. 7.2 . Answer: Technical
, ◉Which of the following is important for good government/contractor
coordination of risk management (RM)? (Select two that apply.) 6.3 .
Answer: Not:
Common approaches to addressing risk.
All personnel committing to plan and execute a successful risk
management (RM) program
◉Which of the following is a critical success factor to ensure effective
risk management (RM)? 4.1 . Answer: Program Risk Process (PRP)
Document
◉Which stage of the issue management (IM) process is characterized by
the following scenario: It has been observed that the battery used in the
new portable Doppler-based wind measuring system doesn't maintain a
charge for long periods of time. After some study, it is determined that
the issue has only a moderate effect on the program's success. 15.1 .
Answer: Not: Issue identification
◉Which of the following is a step of the Department of Defense (DoD)
Risk Management Process? 3.1 . Answer: Mitigation
◉Which of the following are risk process planning objectives? (Select
three that apply.) 6.1 . Answer: Identifies the plan for training Integrated
Product Team (IPT) members in RM techniques
Ensures sound risk management (RM) principles, tools, and techniques
are applied to the risk management program