All welding and cutting on hoisting equipment must be done in
accordance with requirements of what Correct Answers
American society of mechanical engineering (ASME)
All welding and cutting on hoisting equipment needs to be
performed under what requirements Correct Answers 1998
section 9 of A.S.M.E code
At what depth is it required to have a ladder or stairs in trench
Correct Answers 4'
At what intervals should equipment be inspected Correct
Answers Every day do circle check, start of every shift. Every
30 days for rigging. 90 days for full inspection
At which position should the moving parts of the machine be in
when not in use Correct Answers Lowered to the ground and
secured
Before any excavation begins you must do what by law Correct
Answers Notify dig safe
Before loading a machine onto a trailer be sure to check what
Correct Answers Make sure wheels are chalked
Can internal combustion engines be operated in a confined space
Correct Answers Yes if properly ventalated
, Describe a slow moving vehicle triangle and at what speed can
they not exceed Correct Answers Red triangle with an orange
center 25 mph
Do all machines need backup alarms Correct Answers Yes
Do you need a fire extinguisher on a hoisting machine Correct
Answers Yes minimum 5 lbs
Do you need hoisting license on private property Correct
Answers Yes
How close to a marked utility can you dig Correct Answers
Hand dig within 18" of marked utility
How do you get a buried man out of a hole Correct Answers By
hand without the use of any shovels or tools
How do you test the load brakes Correct Answers Pick test, lift
load about 1', hold it for one minute
How far does the spoil have to be from the edge of the hole
Correct Answers 2'
How many cable clips are required on a cable and how are they
installed Correct Answers Minimum of 3, u bolt on the dead,
saddle on the live
How many cubic feet are in a cubic yard Correct Answers 27
How many lbs is 1 ton Correct Answers 2,000 lbs