RISK ASSEMENT REPORT.
DEPARTMENT: MECHANICAL ENGINEERING.
RISK ASSESSEMENT AREA: PLANT WORKSHOP.
DATE: 12th JANUARY 2026.
REVIEW DATE: 22nd JANUARY 2026.
Activity: Location: Name of assessor:
Working in the workshop. Kenya School of TVET. C.Joan.
INTRODUCTION.
This report outline the risk assessement conducted for the mechanical plant
workshop to identify potential hazards and evaluate activities carried out in the
workshop.The activity aims at ensuring safe working of trainees ,staff and entire
workshop users.
Workshop contain several tools that were managed to be monitored.The report aims
at recording likelihood/probability,severity and recommend control measures to
ensure trainees and staff safety and operational efficiency.
HAZARD. RISK. LEVEL OF CONTROL
RISK. MEASURE.
1.Poor Suffocation. Medium. Ellimination by opening
ventilation. vents for free air
circulation.
2.Hanging and Electrocution. High. Insulate naked cables.
naked cables. Death. Use clips and ties.
3.Sharp bench Cuts. Medium. Protect the trainer with
DEPARTMENT: MECHANICAL ENGINEERING.
RISK ASSESSEMENT AREA: PLANT WORKSHOP.
DATE: 12th JANUARY 2026.
REVIEW DATE: 22nd JANUARY 2026.
Activity: Location: Name of assessor:
Working in the workshop. Kenya School of TVET. C.Joan.
INTRODUCTION.
This report outline the risk assessement conducted for the mechanical plant
workshop to identify potential hazards and evaluate activities carried out in the
workshop.The activity aims at ensuring safe working of trainees ,staff and entire
workshop users.
Workshop contain several tools that were managed to be monitored.The report aims
at recording likelihood/probability,severity and recommend control measures to
ensure trainees and staff safety and operational efficiency.
HAZARD. RISK. LEVEL OF CONTROL
RISK. MEASURE.
1.Poor Suffocation. Medium. Ellimination by opening
ventilation. vents for free air
circulation.
2.Hanging and Electrocution. High. Insulate naked cables.
naked cables. Death. Use clips and ties.
3.Sharp bench Cuts. Medium. Protect the trainer with