Crawler 9 Exam with verified solutions ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||||\\//||
According to OSHA, 1926.14,24, which area of a crawler crane should be barricaded. - ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔The rear swing radius ||\\//|| ||\\//|| ||\\//|| ||\\//||
When a sudden and unexpected shock, load has been applied to the boom the Operator
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
shall - correct answer✔✔Insure an inspection is done immediately
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
A pin connected, lattice boom is being dismantled. After connecting the pendant lines to the
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
maximum cantilever point and slightly lifting the boom off the ground the next step is to ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
remove the. - correct answer✔✔Lower pins located at the head of the pendants
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
What percentage of tipping are crawlers usually rated at - correct answer✔✔75%
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
According to OSHA, 1926.1437 when operating a barge, it is necessary to - correct ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔Secure the crane to the barge ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
When lifting over the side of a crawler crane, the tipping access on the crane will change -
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔The tracks are extended or retracted ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
According to ASME, be 30.5 the boom shall not be lowered to the point to where there are ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
less than how many wraps on the boom hoist drum? - correct answer✔✔2
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Which boom configuration will lose the most capacity when the crane is working out of level
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
- correct answer✔✔Long boom, short radius
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||