CCO practice test with verified detailed solutions ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Before crane erection can begin what must be available? - correct answer✔✔surface that is
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
firm, drained and graded ||\\//|| ||\\//|| ||\\//||
OSHA 29 CFR 1926.1407 Power Line Safety, Option 1 requires what? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔Power lines are de-energize and grounded ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Before work can begin for a newly erected tower crane what must be done before the crane
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
can begin working? - correct answer✔✔set load motion limits and safety devices
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
What type of attachment system is used to hold a personnel platform to the crane hook? -
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔Master link attachment or safety type shackle
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
When should a personnel platform be used? - correct answer✔✔There is no other safe way
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
to perform the task
||\\//|| ||\\//|| ||\\//||
OSHA, Cranes and Derricks working in Construction is under what regulation? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔OSHA 29 CFR 1926.550 ||\\//|| ||\\//|| ||\\//||
What is the Safety Factor for suspended platform and shackles? - correct answer✔✔5 to 1
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
What ASME Standard applies to personnel platforms? - correct answer✔✔B 30.23
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Annual inspection records must be kept for how long? - correct answer✔✔12 months
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
What ASME Standard applies to Tower Cranes? - correct answer✔✔B 30.3
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
, Expendable tower base, the tolerance for "plumb" is? - correct answer✔✔¼ - 10ft. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Free standing Hammerhead tower crane mast will be "plumbed" to a tolerance of - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔1 inch= 40ft. ||\\//|| ||\\//||
Before crane components are erected they shall be: - correct answer✔✔Visually inspected
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
for damage from shipping and handling
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Where would the insulating link device be attached? - correct answer✔✔Attached or
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
installed at the end of load line and the load ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Annual/comprehensive inspection must include the qualified person to perform what? - ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔Functional motion testing of the equipment
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Rail buffers or rail stops must be placed how far from the end of the travel tracks? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔3 ft ||\\//||
Internal climbing crane must be plumbed by using what to hold crane in position? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔Wedges
What is the maximum rate of wind speed allowed to climb a tower crane? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔20 mph ||\\//||
during erection or dismantling operations, who must always be present? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔AD director ||\\//||
How many wraps shall remain on the hoist drum according to the Tower Crane Reference
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Manual? - correct answer✔✔3 wraps on the hoist drum ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Before crane erection can begin what must be available? - correct answer✔✔surface that is
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
firm, drained and graded ||\\//|| ||\\//|| ||\\//||
OSHA 29 CFR 1926.1407 Power Line Safety, Option 1 requires what? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔Power lines are de-energize and grounded ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Before work can begin for a newly erected tower crane what must be done before the crane
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
can begin working? - correct answer✔✔set load motion limits and safety devices
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
What type of attachment system is used to hold a personnel platform to the crane hook? -
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔Master link attachment or safety type shackle
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
When should a personnel platform be used? - correct answer✔✔There is no other safe way
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
to perform the task
||\\//|| ||\\//|| ||\\//||
OSHA, Cranes and Derricks working in Construction is under what regulation? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔OSHA 29 CFR 1926.550 ||\\//|| ||\\//|| ||\\//||
What is the Safety Factor for suspended platform and shackles? - correct answer✔✔5 to 1
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
What ASME Standard applies to personnel platforms? - correct answer✔✔B 30.23
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Annual inspection records must be kept for how long? - correct answer✔✔12 months
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
What ASME Standard applies to Tower Cranes? - correct answer✔✔B 30.3
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
, Expendable tower base, the tolerance for "plumb" is? - correct answer✔✔¼ - 10ft. ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Free standing Hammerhead tower crane mast will be "plumbed" to a tolerance of - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔1 inch= 40ft. ||\\//|| ||\\//||
Before crane components are erected they shall be: - correct answer✔✔Visually inspected
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
for damage from shipping and handling
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Where would the insulating link device be attached? - correct answer✔✔Attached or
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
installed at the end of load line and the load ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Annual/comprehensive inspection must include the qualified person to perform what? - ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
correct answer✔✔Functional motion testing of the equipment
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Rail buffers or rail stops must be placed how far from the end of the travel tracks? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔3 ft ||\\//||
Internal climbing crane must be plumbed by using what to hold crane in position? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔Wedges
What is the maximum rate of wind speed allowed to climb a tower crane? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔20 mph ||\\//||
during erection or dismantling operations, who must always be present? - correct
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
answer✔✔AD director ||\\//||
How many wraps shall remain on the hoist drum according to the Tower Crane Reference
||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||
Manual? - correct answer✔✔3 wraps on the hoist drum ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//|| ||\\//||