The law that set into place stormwater regulations in the The Clean Water Act
1970s is
Regulations for managing stormwater activity on a NPDES
construction site are outlined in the
When should you read and understand your project Immediately after the project awarded and before you begin any site work is
stormwater pollution prevention plan
Which of the following is not an allowable stormwater Discharges are contaminated groundwater
discharge or non-stormwater discharge
Construction activity may begin When the jurisdiction of operation specifies you can start
Waters that sell anti-degration standards are placed on 303D
the _______ list
SWPP certifications are signed by An officer of the project owner or an officer of the general contractor.
TRUE OR FALSE: The document that must be completed False
signed and submitted to the state to obtain authorization
to discharge is the NOT
The notice of termination can be filed when All construction inside and outside of the building is completed and the final
stabilization has been verified as complete
, Operators on a construction site are the entity in charge Is in charge of daily activities
of plans and specifications and the entity who is
You should have a SWPPP for your construction site 1. Its documents stormwater management
because (3 reasons) 2. Demonstrates your intent to manage stormwater on your site
3. It is required by law
A well constructed SWPPP for your site should be Site specific
The NO must be submitted Prior to you commencing construction
One necessary component of a good SWPPP is A schedule of activities
Factors that may impact the SWPPP scheduling activities Weather and climate
include
Pollutant sources on a construction site may include (3) 1. petroleum storage tanks
2. Masonry material
3. soil amendment
The following considerations may be incorporatedd into Endangered species and historical preservation
SWPPP
If you beileve BMP modifications are necessary onsite Seek written approval of the project SWPPP designer and project owner
you must,
The SWPPP will contain the following (3) 1. Erosion and sediment control bet management practices
2. A site specific sequence of construction activiites
3. site maps
Once a site has experienced a rain event of measurable Deficit and fialed BMP's and repair
quantity you must identify
The document that contains the permit number is The permit authorization letter
The portion of the the SWPPP that specifies the content The table of contents
of the SWPPP is
The document in the SWPPP that certifies the GC's The SWPPP certification letter
commitment to compliance with the SWPPP
The certifactions letter that identifies the name and The subcontractors certification form
contact information of subcontractors on the site is
The documents that reveal the total area of disturbance The site maps
are
The document completed by the project SWPPP The inspection report form
inspector recording site conditions during the inspection
is