with Elaborate Exam
1. Typical Design PM Responsibilities: - ANSWER -Review expression of
interest for client.
-Perform a user needs analysis.
-Perform site surveys and meet with client.
-Generate preliminary design submittals.
-Respond to/incorporate client comments.
-Prepare final bid documents/RFP and engineer's cost estimate.
-Issue final RFP package to client.
-Client makes RFP available to potential bidders.
2. Typical Implementation/Installation TPM Responsibilities: - ANSWER -
Review client RFP and associated documents.
-Perform site surveys.
-Organize and submit bidders questions to client.
-Organize and submit final proposal/bid documents to client.
-Client awards contract and gives contractor notice to proceed.
-Contractor mobilizes.
-Project implementation begins.
3. Risk Breakdown Structure - ANSWER Categories checklist.
4. Qualitative Risk Analysis - ANSWER Subjective ranking w/ expert
judgment.
, 5. Quantitative Risk Analysis - ANSWER Statistical/mathematical impact
modeling.
6. Chemotherapy common side effects - ANSWER Physical pain,
Extravasation, Systemic effects
7. Cytotoxic agents include 2 types - ANSWER Vesicant: severe &
irreversible damage, resulting in necrosis;
Irritant: local inflammation, unlikely to cause permanent damage
8. Extravasation injury depends on - ANSWER Type, Concentration &
Quantity (Leakage & Involuntary injection)
Need adequate guideline, training & correct treatment
9. Central/ Hickman - ANSWER Allow for multiple administration, single
insertion under anesthesia & painless during infusion
10.Skin reaction in increasing severity - ANSWER Erythema, Moist
desquamation, Epilation, Radiation necrosis, Pigmentation, Telangiectasia
11.Acute radiation dermatitis Grade I and Grade II - ANSWER Grade I: Faint
erythema, dry desquamation
Grade II: Moderate erythema, patchy moist desquamation
12.Acute radiation dermatitis Grade III and Grade IV - ANSWER Grade III:
Moist desquamation, bleeding
Grade IV: Necrosis/ ulceration, spontaneous bleeding