Questions with Correct Answers
Latest Edition
1. Existing Veg, Desc/Purp - ANSWER temp or perm bmp desi to stab soil
and remove sups part from sheet flow runoff.
2. Existing Veg, Objectives - ANSWER a) Site Plan and Mang
b) Erosi Cont
c) Sedi Cont
d) Post-Cons Mang
3. Existing Veg, applic - ANSWER a) Areas within site where no const
activity is occur
b) Areas where local, state and fed govt require preservation
c) Areas where existing veg can be utilized for eros, sedi, and storm water.
4. Sediment basin: descri & purp - ANSWER a structural bmp that allows
stormwater to be collected, and allows sediment present to fall out of
suspension before teh water is allowed to undergo controlled release
5. Sediment basin: Object - ANSWER 1) sediment control
2) runoff control
3) post construction management
,6. Sanitary waste mgmt desc purpose - ANSWER structural BMP to prevent
septic/sanitary waste from being released
7. Sanitary waste mgmt obj - ANSWER good housekeeping/mater mgmt
post contrution
8. Stockpile MGMT desc/purp - ANSWER procedural bmp involves storage
and use of stockpiles and materials
9. Stockpile MGMT objective - ANSWER good housekeeping/mater mgmt.
erosion control
sediment control
post construction mgmt.
10.Street cleaning objective - ANSWER good housekeeping/mater mgmt.
sediment control
post construction mgmt.
11.Trash containment objectives - ANSWER good housekeeping/mater mgmt.
post construction mgmt.
12.Wind fence obj - ANSWER good housekeeping/mater mgmt.
13.Final Stabilization desc/purp - ANSWER all soil disturbing activities are
complete all permanent stabilization measures are installed
,14.Final stabilization obj - ANSWER post const mgmt
erosion control
15.head/end/wing walls desc purp - ANSWER soil behind wall is stablized to
prevent sediment introduction
16.head/end/wing walls obj - ANSWER post cont mgmt
erosion control
17.level/ flow spreader desc/purp - ANSWER disperses concentrated runoff to
sheet flow and released to areas already stabilized
18.level/ flow spreader obj - ANSWER post cont mgmt
runoff control
erosion control
19.Permeable surfaces obj - ANSWER post cont mgmt
runoff control
erosion control
20.infiltration basin/pond desc/purp - ANSWER shallow impoundment
designed to infiltrate stormwater into the soil
21.infiltration basin/pond obj - ANSWER post cont mgmt
runoff control
sediment control
, 22.infiltration trench desc/purp - ANSWER rock filled trench with no outlet
that recieves runoff. runoff passes through and infiltrates into soil
23.infiltration trench obj - ANSWER post const mgmt
runoff control
sediment control
24.Bioretention desc/purp - ANSWER uses landscape features to provide
stormwater runoff treatment. may include treatment solutions and volume
control
25.bioretention obj - ANSWER post const mgmt
runoff control
sediment control
26.permanent Catch basin insert obj - ANSWER post const mgmt
sediment control
27.inline stormwater treatment devices desc/purp - ANSWER placed inline of
stormwater device for removal of targetted pollutants. may split flow to treat
first flush, specific pollutant.
28.permanent Catch basin insert desc/purp - ANSWER function to trap
sediment, debris and pollutants. may include components such as trays, filter
fabric, and plastic boxes.