ANSWERS
USACE Response Options - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\
✔✔Forward Engineer Support Team-Advance (FEST-A) or
|\ |\ |\ |\ |\ |\
Reconnaissance Team (RT) |\ |\
Advanced Echelon (ADVON) team
|\ |\ |\
Contingency Engineer District (CED) |\ |\ |\
Reconnaissance Tasks - CORRECT ANSWERS ✔✔Technical |\ |\ |\ |\ |\ |\
Reconnaissance (**General Engineers) |\ |\
Infrastructure Survey |\
Environment Assessment |\
Airfield Assessment
|\
Route Classification
|\
Tactical Reconnaissance (**Combat Engineers)
|\ |\ |\
Bridge Reconnaissance
|\
Route Reconnaissance
|\
Obstacle Reconnaissance|\
Reconnaissance vs. Classification - CORRECT ANSWERS |\ |\ |\ |\ |\ |\
✔✔Classification is done by General Engineers |\ |\ |\ |\ |\
,Reconnaissance is done by Combat Engineers |\ |\ |\ |\ |\
SWEAT-MSO - CORRECT ANSWERS ✔✔Sewage |\ |\ |\ |\
Water
Electricity
Academics
Trash
Medical
Safety
Other Considerations
|\
MDMP and Construction Planning - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\
✔✔MDMP nests within construction planning and EN
|\ |\ |\ |\ |\ |\ |\
requirements for sustainment |\ |\
Project Origin/Routing - CORRECT ANSWERS ✔✔Unit
|\ |\ |\ |\ |\ |\
requests on a DA4283 |\ |\ |\
Go to DPW for approval
|\ |\ |\ |\
Create list for troop construction requests
|\ |\ |\ |\ |\
S3 syncs with DPW for project
|\ |\ |\ |\ |\
Projects are picked and project packet are given; scope of
|\ |\ |\ |\ |\ |\ |\ |\ |\
work, site plan, and drawings
|\ |\ |\ |\ |\
, S3C produces construction directive, BOM, and Construct
|\ |\ |\ |\ |\ |\ |\
Activities
Project assigned to executing company
|\ |\ |\ |\
Definable Features of Work - CORRECT ANSWERS |\ |\ |\ |\ |\ |\ |\
✔✔project supervisor identifies features of work during
|\ |\ |\ |\ |\ |\ |\
estimating and scheduling process. "Task which is sperate
|\ |\ |\ |\ |\ |\ |\
and distinct from other tasks, has separate control
|\ |\ |\ |\ |\ |\ |\ |\ |\
requirements, and may be identified by different trades or |\ |\ |\ |\ |\ |\ |\ |\
disciplines, or it may be work by the same trade in a
|\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\ |\
different environment" |\
For each definable feature of work - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\ |\ |\ |\
✔✔Prep Phase: apply network analysis, scheduling,
|\ |\ |\ |\ |\ |\
estimating
Initial Phase: Choosing configuration, materials,
|\ |\ |\ |\ |\
equipment
Follow Up Phase: adherence to standard procedures
|\ |\ |\ |\ |\ |\
Completion Phase: (in doctrine - rework phase) |\ |\ |\ |\ |\ |\
Quality Management (QM) - CORRECT ANSWERS
|\ |\ |\ |\ |\ |\
✔✔consists of Quality Assurance and Quality Control |\ |\ |\ |\ |\ |\ |\
activities instituted to achieve the quality levels
|\ |\ |\ |\ |\ |\ |\
established by project plans and specifications or as |\ |\ |\ |\ |\ |\ |\ |\
directed quality established by the contract requirements
|\ |\ |\ |\ |\ |\