ASSOCIATE 2026-2027 BANK QUESTIONS
ACCURATE ACTUAL EXAM || FREQUENTLY TESTED
QUESTIONS WITH DETAILED ANSWERS |
GUARANTEED PASS | ALREADY GRADED A+ |
BRAND NEW!!
A customer currently has a 40 TB of free storage on their
FlashArray//X and it requires an additional 10 TB for file
workloads. Their priority is to keep infrastructure costs as
low as possible.
What should the SE recommend?
A: Purchase an entry-level FlashBlade for the file workload
,B: NDU the FlashArray for both workloads
C: Use the existing FLashArray for both workloads
D: Add another disk pool for the file storage to their current
FlashArray - ANSWER-C: Use the existing FLashArray for
both workloads
Which recommendation should the SE provide if the
customer wants to add an additional 10 TB of test/dev
workload to the FlashArray?
A: Upgrade the controller to the latest generation to handle
the additional workload
B: Add more DirectFlash NVMe modules to the existing
expansion shelf to handle the additional capacity.
,C: The workload can be added, but the admin should
continue monitoring performance and capacity.
D: Upgrade the existing 22 TB DirectFlash NVMe modules
to a higher capacity to handle the additonal workload. -
ANSWER-C: The workload can be added, but the admin
should continue monitoring performance and capacity.
Which advantage does the FlashArray system provide in
the event of a ransomware attack?
A: Supports antivirus software directly on the array to
remediate the attack.
B: Built-in ransomware detection algorithms prevent
attacks in real-time.
, C: Rapid data recovery occurs through high-speed
snapshot restoration. - ANSWER-C: Rapid data recovery
occurs through high-speed snapshot restoration.
A customer plans to purchase a FlashArray system to
support their current workload needs as well as prepare
for the future growth. They have expressed a requirement
of adding only drives when the time comes for an upgrade,
even if that means purchasing more controllers or shelves
up front.
Based on the provided information about the data set size,
reducibility, and performance, the SE determines that the
customer wants at least 175 TB of raw capacity in the
FlashArray//X now and add on at least 100 TB more raw
capacity in the upgrade.