and correct detailed answers latest update
this year
Save
Practice questions for this set
Learn 1 /7 Study using Learn
, Don't know?
Terms in this set (61)
Roll is controlled by the ___________ Ailerons
Select all that apply: To help SADCLAM
remember the 7 Critical Skills of DAMCLAS
CRM, just remember one of
these two acronyms.
______________ is the forward force Thrust
produced by the power
plant/propeller or rotor that
sets a UA in motion.
,If a procedure states to land as Practical
soon as __________, the operator
has the time to plan and locate
a suitable landing site. This may
include recovering at the launch
site or a contingent landing
location.
On the chart, controlled Blue Vignette
airspace floors of 1200ft above
the ground are defined by a
________ shaded area.
, Before landing, operators must True
receive landing clearance from
Air Traffic Control unless
otherwise specified in a
memorandum of agreement.
One of the computerized flight Falcon View
planning applications
commonly used is ____________,
which displays various maps and
chart types and geographically
referenced overlays.