Two security professionals (Jo and Chris) are discussing
the contracting process.
-Jo says that the Federal Acquisition Regulation (FAR)
governs the process the federal government uses to
acquire or purchase goods and services
-Chris says that although the FAR's intent is to provide
uniform and government wide policies and procedures for
acquisition, and DOD has issued a supplemental
acquisition regulation called the DFAR
Who is correct? - Answer-Both are correct
Two security professionals (Jo and Chris) are discussing
the FAR.
-Jo says that to be awarded a contract, a bidder needs to
show that his or her organization it meets the FAR
provisions of that contract
,2|Page
-Chris says that a bidder can be awarded a contract with
FAR provisions if his or her organization can demonstrate
that it will be able to comply with those provisions at the
time of the contract award
Who is correct? - Answer-Both are correct
Which of the following roles associated with the
contracting process does not require contract expertise? -
Answer-Contracting Officer's Technical Representative
Two security professionals (Jo and Chris) are discussing
the process for including security requirements in a
contract
-Jo says that the FAR requires that a Contract Security
Classification Specification (DD Form 254) be included or
integrated in classified contracts
-Chris says that by signing the Security Agreement (DD
Form 441), a contractor commits to establishing an
Industrial Security Program that complies with DoD
5200.1-M
Who is correct? - Answer-Both are correct
, 3|Page
Two security professionals (Jo and Chris) are discussing
the process for including security requirements in a
contract
-Jo says that every security requirement levied upon a
contractor must be addressed in the contact
-Chris says that security requirements outside of the
NISPOM scope cannot be included in a contract
Who is correct? - Answer-Jo is correct
Two security professionals (Jo and Chris) are discussing
the various roles associated with the contacting process
-Jo says that the Contracting Officer's Representative has
the authority to make contract changes that affect contract
term such as price, quality, quantity, and delivery
-Chris says that a Contracting Officer has the authority to
enter into, administer, and terminate contracts
Who is correct? - Answer-Chris is correct