NICET HIGHWAY CONSTRUCTION
INSPECTOR LEVEL III PRACTICE
EXAM 1 QUESTIONS WITH CORRECT
ANSWERS
Duringkinstallationkofktraffickloopskinkthekpavement,kwhichkthreekstatementskapplykpriorktokandkduringkthek
installationkofkloopkwire?k(Choosek3).
a)kDoknotkallowkvehicularktraffickoverkankopenksawkcut.
b)kDoknotkoverlapksawkcutskatkthekcorner.
c)kThoroughlykcleanktheksawkcutkofkforeignkmaterial.
d)kUsekakplasticksleevekwherekloopkwirekcrosseskakjoint.k-kCORRECTkANSWER-
a)kDoknotkallowkvehicularktraffickoverkankopenksawkcut.
c)kThoroughlykcleanktheksawkcutkofkforeignkmaterial.
d)kUsekakplasticksleevekwherekloopkwirekcrosseskakjoint.
Thekcontractorkiskinstallingkakculvertkwithkak12-
inchkreinforcedkconcretekpipek(koutsidekdiameterkofk16.50kinches)kfromkStak10+00,k40kfeetkLeftktokSTAk10+
00,k65kfeetkRightkonk4-inchkbeddingkmaterial.kThek12-
inchkRCPkoutletkisktokbekinstalledkatkStak10+00,k40kfeetkLeftkatkankinvertkelevationkofk652.50.
Ifkthekconduitkiskinstalledkatkak1.40%kslope,kwhatkiskthekelevationkofkthekfoundationkgradekatkStak10+00,k45k
feetkRight?
a)k652.04
b)k653.17
c)k653.36
d)k653.50k-kCORRECTkANSWER-?
,Onkthekreservoirksidekofkakdam,kerosionkprotectionkagainstkwavekactionkshouldkextendkupkthekslopektokatkle
astkwhichklevel?
a)kcrestkofkdam
b)kmaximumkwaterkelevation
c)kminimumkwaterkelevation
d)ktwo-thirdskthekheightkofkthekdamk-kCORRECTkANSWER-b)kmaximumkwaterkelevation
Duringkstagekconstructionkwhilekinstallingkdrainage,kthekcontractorkmustkcompletekwhichktwokofkthekfollo
wingktasks?k(Choosektwo).
a)kBulkkheadkthekpipekuntilktheksystemkiskcomplete.
b)kCompletekthekentireksystemkbeforekitkrains.
c)kMaintainkthekexistingkdrainageksystemkuntilktheknewksystemkiskfunctional.
d)kProvidektemporarykconnectionskaskneededktokmaintainkthekexistingksystem.k-kCORRECTkANSWER-
c)kMaintainkthekexistingkdrainageksystemkuntilktheknewksystemkiskfunctional.
d)kProvidektemporarykconnectionskaskneededktokmaintainkthekexistingksystem.
Afterkflushingkbutkbeforekconnectingkaknewkmainktokthekexistingksystem,kwhatktestkdoeskankinspectorkneed
ktokverifykbeforekplacingkthekmainkintokservice?
a)kbacteriologicalktesting
b)kcoverktesting
c)kdeflectionktesting
d)kpressurektestingk-kCORRECTkANSWER-d)kpressurektesting
Whichkthreektypeskofkinspectionskarekcompletedkforksignkstructures?k(Choosekthree).
a)kfinalkinspection
b)kinterimkinspection
, c)kinitialkinspection
d)kroutinekinspectionk-kCORRECTkANSWER-b)kinterimkinspection
c)kinitialkinspection
d)kroutinekinspection
Howkmanyktimeskperkfootkshouldkloopklead-inkwireskbektwisted?
a)k3kturnskperkfoot
b)k5kturnskperkfoot
c)k6kturnskperkfoot
d)k7kturnskperkfootk-kCORRECTkANSWER-b)k5kturnskperkfoot
Whichkphrasekisktruekofktestkreportskrequiredkforkconcreteksidewalks,kasphaltkpavement,kconcretekcurb,ka
ndkpipekculvertskforkrestkareas?
a)k50%krequiredkonkroadwaykcontracts
b)krequiredkforkfederal-aidkprojectskonly
c)ksamekaskroadwaykcontracts
d)ksubmittedkinkduplicatek-kCORRECTkANSWER-?
AccordingktokFP-
14,kwhenkremovingkexistingkconcretekstructurekinkthekroadbed,khowkmanykincheskbelowktheksubgradekele
vationkshouldkthekexistingkstructurekbekremovedkto?
a)k12kinches
b)k24kinches
c)k30kinches
d)k36kinchesk-kCORRECTkANSWER-d)k36kinches
Whatkdoeskakwhitekdiskkonkthekfirekhydrantkrepresent?
INSPECTOR LEVEL III PRACTICE
EXAM 1 QUESTIONS WITH CORRECT
ANSWERS
Duringkinstallationkofktraffickloopskinkthekpavement,kwhichkthreekstatementskapplykpriorktokandkduringkthek
installationkofkloopkwire?k(Choosek3).
a)kDoknotkallowkvehicularktraffickoverkankopenksawkcut.
b)kDoknotkoverlapksawkcutskatkthekcorner.
c)kThoroughlykcleanktheksawkcutkofkforeignkmaterial.
d)kUsekakplasticksleevekwherekloopkwirekcrosseskakjoint.k-kCORRECTkANSWER-
a)kDoknotkallowkvehicularktraffickoverkankopenksawkcut.
c)kThoroughlykcleanktheksawkcutkofkforeignkmaterial.
d)kUsekakplasticksleevekwherekloopkwirekcrosseskakjoint.
Thekcontractorkiskinstallingkakculvertkwithkak12-
inchkreinforcedkconcretekpipek(koutsidekdiameterkofk16.50kinches)kfromkStak10+00,k40kfeetkLeftktokSTAk10+
00,k65kfeetkRightkonk4-inchkbeddingkmaterial.kThek12-
inchkRCPkoutletkisktokbekinstalledkatkStak10+00,k40kfeetkLeftkatkankinvertkelevationkofk652.50.
Ifkthekconduitkiskinstalledkatkak1.40%kslope,kwhatkiskthekelevationkofkthekfoundationkgradekatkStak10+00,k45k
feetkRight?
a)k652.04
b)k653.17
c)k653.36
d)k653.50k-kCORRECTkANSWER-?
,Onkthekreservoirksidekofkakdam,kerosionkprotectionkagainstkwavekactionkshouldkextendkupkthekslopektokatkle
astkwhichklevel?
a)kcrestkofkdam
b)kmaximumkwaterkelevation
c)kminimumkwaterkelevation
d)ktwo-thirdskthekheightkofkthekdamk-kCORRECTkANSWER-b)kmaximumkwaterkelevation
Duringkstagekconstructionkwhilekinstallingkdrainage,kthekcontractorkmustkcompletekwhichktwokofkthekfollo
wingktasks?k(Choosektwo).
a)kBulkkheadkthekpipekuntilktheksystemkiskcomplete.
b)kCompletekthekentireksystemkbeforekitkrains.
c)kMaintainkthekexistingkdrainageksystemkuntilktheknewksystemkiskfunctional.
d)kProvidektemporarykconnectionskaskneededktokmaintainkthekexistingksystem.k-kCORRECTkANSWER-
c)kMaintainkthekexistingkdrainageksystemkuntilktheknewksystemkiskfunctional.
d)kProvidektemporarykconnectionskaskneededktokmaintainkthekexistingksystem.
Afterkflushingkbutkbeforekconnectingkaknewkmainktokthekexistingksystem,kwhatktestkdoeskankinspectorkneed
ktokverifykbeforekplacingkthekmainkintokservice?
a)kbacteriologicalktesting
b)kcoverktesting
c)kdeflectionktesting
d)kpressurektestingk-kCORRECTkANSWER-d)kpressurektesting
Whichkthreektypeskofkinspectionskarekcompletedkforksignkstructures?k(Choosekthree).
a)kfinalkinspection
b)kinterimkinspection
, c)kinitialkinspection
d)kroutinekinspectionk-kCORRECTkANSWER-b)kinterimkinspection
c)kinitialkinspection
d)kroutinekinspection
Howkmanyktimeskperkfootkshouldkloopklead-inkwireskbektwisted?
a)k3kturnskperkfoot
b)k5kturnskperkfoot
c)k6kturnskperkfoot
d)k7kturnskperkfootk-kCORRECTkANSWER-b)k5kturnskperkfoot
Whichkphrasekisktruekofktestkreportskrequiredkforkconcreteksidewalks,kasphaltkpavement,kconcretekcurb,ka
ndkpipekculvertskforkrestkareas?
a)k50%krequiredkonkroadwaykcontracts
b)krequiredkforkfederal-aidkprojectskonly
c)ksamekaskroadwaykcontracts
d)ksubmittedkinkduplicatek-kCORRECTkANSWER-?
AccordingktokFP-
14,kwhenkremovingkexistingkconcretekstructurekinkthekroadbed,khowkmanykincheskbelowktheksubgradekele
vationkshouldkthekexistingkstructurekbekremovedkto?
a)k12kinches
b)k24kinches
c)k30kinches
d)k36kinchesk-kCORRECTkANSWER-d)k36kinches
Whatkdoeskakwhitekdiskkonkthekfirekhydrantkrepresent?