On site sewage systems 2026| answered 100% correctly
On site sewage systems 2026| answered 100% correctly Should the distribution pipes in a filter bed leaching bed be: evenly spaced? What should be left uncovered after installing a sewage system and before placing the backfill and topsoil? Distribution boxes and header pipes Perforated distribution pipes Bottom end of the leaching bed Who is ultimately responsible for the proper installation of the sewage system, the installer or the inspector? the installer What should the installer do if a boulder is encountered at the elevation that the tank is to be placed at the bottom of the tank excavation? Remove the boulder. Backfill the void with compacted granular fill. If a worker has to go into the excavation to compact the granular fill, what are the steepest side slopes allowed under the Occupational Health and Safety Act? Side slopes no steeper than 1 horizontal to 1 vertical unit. Should the setting in a tank that sounds the alarm be set below the full capacity of the tank? Yes Under what conditions would you decide to use a granular material to backfill around the septic tank, once it is placed in the hole? If the native soils were too wet If the native soils were too stony Would you actually fill a tank with water prior to placing the backfill?
Written for
- Institution
- On site sewage systems 2026
- Course
- On site sewage systems 2026
Document information
- Uploaded on
- February 12, 2026
- Number of pages
- 43
- Written in
- 2025/2026
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
on site sewage systems 2026
-
should the distribution pipes in a filter bed leac
-
what should be left uncovered after installing a s
-
who is ultimately responsible for the proper insta
Also available in package deal