Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

RVTI Level 2 Certification Exam Study Questions with 100% Correct Answers (Guarantee Pass) | Latest Edition

Rating
-
Sold
1
Pages
13
Grade
A+
Uploaded on
14-02-2026
Written in
2025/2026

RVTI Level 2 Certification Exam Study Questions with 100% Correct Answers (Guarantee Pass) | Latest Edition 1. When replacing an intermediate aluminum sidewall panel, - ANSWER it is not necessary to remove all panels below 2. When repairing a large gouge in a flat fiberglass panel, the technician typically uses - ANSWER fiberglass mat, resin, fill and finish 3. When a customer complains about water line vibration noise to the kitchen slide room only when the pump is running, one possible cause is A. Unsecured water distribution line B. Low battery voltage C. Excessive system pressure D. A defective faucet - ANSWER A. Unsecured water distribution line 4. What causes intermittent hot and cold water at all faucets? A. Bypass water heater B. Defective shower hose C. Open water heater bypass valve D. Water heater just turned on - ANSWER C. Open water heater distribution valve 5. The size of hose in a freshwater distribution system is determined by A. The number of fixtures in the distribution system The number of fixtures in the distribution system The water pressure from the city water system The water pressure from the city water system The size of the fresh water storage tank - ANSWER A. The number of fixtures in the distribution system 6. When replacing a solid waste holding tank and individual monitor probes, the probes should be installed A. Vertically B. Horizontally C. Diagonally D. In any direction - ANSWER C. Diagonally 7. Of the steps listed below, the FIRST step in replacing a solid waste holding tank is to A. Remove the internal monitor panel probes B. Open the termination valve C. Disconnect the sewer flusher D. Rinse the tank - ANSWER B. Open the termination valve 8. Technician A says that contracting the HIV AIDS virus is possible from working with wastewater. Technician B says that there are minimal health risks associated with contact with human waste. Which technician is correct? A. Technician A B. Technician B C. Both technicians are correct D. Neither technician is correct - ANSWER B. Technician b 9. When mounting a replacement exterior aluminum panel, it must - ANSWER have a 1/16" to 1/8" seam gap 10.When installing vertical trim molding, the one sealant type that would NEVER be used is - ANSWER self-leveling sealer 11.Installation of plastic or fiberglass components may require the use of - ANSWER pilot holes 12.Which of the following is NOT recommended when working with waste water piping system? A. Wear cotton gloves to prevent cuts and contact with waste or sewage B. Follow good hygiene practices of washing hands thoroughly before eating, drinking or smoking C. Clean and decontaminate all tools used in the service operation using spray disinfectant such as lysol D. Use protective face mask or splash proof face shield to protect nose and mouth from splashes - ANSWER A. Wear cotton gloves to prevent cuts and contact with waste or sewage 13.The non-pressure water storage tank is permitted to be filled by the onboard city water system A. If the tank's vent is equal to or larger than the fill line B. Only on large class a motorhomes C. If the city pressure exceeds pump pressure D. Only on unregulated city water supplies - ANSWER A. If the tank's cent is equal to or larger than the fill line 14.Choose from _____ grades of antifreeze that are suitable for the _____ when winterizing. - ANSWER 2; temperature 15.During winterization of an entire RV water system, all water is - ANSWER Replaced with antifreeze to prevent freezing 16.What does the liquid waste holding tank contain, and what does the body waste holding tank contain? - ANSWER Gray water; solid waste water 17.An anti-siphon trap device can be substituted for a - ANSWER Secondary vent 18.When an RV is equipped with a liquid waste holding system, a _____ test should be performed for 15 minutes during a fixture flood test. - ANSWER Static water 19.When conducting PDI of a waste water system, conduct a flow test _____ a flood test. - ANSWER Before 20.What is measured in the picture below? - ANSWER Main drain termination area 21.When winterizing the waste system, what is the purpose of pouring another cup of antifreeze down the drain at the kitchen, lavatory sink, and show/tub drains? - ANSWER To check if the p-traps have antifreeze 22.After flushing and cleaning holding tanks during winterization, drain each tank and - ANSWER Close termination valves 23.Sewage wastewater holding tanks can receive discharge from - ANSWER Any number of RV fixtures 24.Which test requires the entire drainage system, including holding tanks, to be filled until water appears at the bottom of the lowest fixture on each system? - ANSWER Fixture flood test

Show more Read less
Institution
RVTI Level 2
Course
RVTI Level 2

Content preview

RVTI Level 2 Certification Exam
Study Questions with 100% Correct
Answers (Guarantee Pass) | Latest
Edition

1. When replacing an intermediate aluminum sidewall panel, - ANSWER it is
not necessary to remove all panels below


2. When repairing a large gouge in a flat fiberglass panel, the technician
typically uses - ANSWER fiberglass mat, resin, fill and finish


3. When a customer complains about water line vibration noise to the kitchen
slide room only when the pump is running, one possible cause is
A. Unsecured water distribution line
B. Low battery voltage
C. Excessive system pressure
D. A defective faucet - ANSWER A. Unsecured water distribution line


4. What causes intermittent hot and cold water at all faucets?
A. Bypass water heater
B. Defective shower hose
C. Open water heater bypass valve
D. Water heater just turned on - ANSWER C. Open water heater
distribution valve


5. The size of hose in a freshwater distribution system is determined by
A. The number of fixtures in the distribution system

, The number of fixtures in the distribution system
The water pressure from the city water system
The water pressure from the city water system
The size of the fresh water storage tank - ANSWER A. The number of fixtures
in the distribution system


6. When replacing a solid waste holding tank and individual monitor probes,
the probes should be installed
A. Vertically
B. Horizontally
C. Diagonally
D. In any direction - ANSWER C. Diagonally


7. Of the steps listed below, the FIRST step in replacing a solid waste holding
tank is to
A. Remove the internal monitor panel probes
B. Open the termination valve
C. Disconnect the sewer flusher
D. Rinse the tank - ANSWER B. Open the termination valve


8. Technician A says that contracting the HIV AIDS virus is possible from
working with wastewater. Technician B says that there are minimal health
risks associated with contact with human waste. Which technician is correct?
A. Technician A
B. Technician B
C. Both technicians are correct
D. Neither technician is correct - ANSWER B. Technician b


9. When mounting a replacement exterior aluminum panel, it must -
ANSWER have a 1/16" to 1/8" seam gap

Written for

Institution
RVTI Level 2
Course
RVTI Level 2

Document information

Uploaded on
February 14, 2026
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$11.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller
Seller avatar
DrSammuel

Get to know the seller

Seller avatar
DrSammuel TeachmeTutor
Follow You need to be logged in order to follow users or courses
Sold
4
Member since
4 months
Number of followers
0
Documents
730
Last sold
1 month ago
Turning Preparation into Achievement.

Welcome to my study resource hub! This account provides high-quality exam papers with clear and detailed elaborations designed to help students fully understand each topic and pass with confidence.

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions