1. When replacing an intermediate aluminum sidewall panel, - ANSWER it is
not necessary to remove all panels below
2. When repairing a large gouge in a flat fiberglass panel, the technician
typically uses - ANSWER fiberglass mat, resin, fill and finish
3. When a customer complains about water line vibration noise to the kitchen
slide room only when the pump is running, one possible cause is
A. Unsecured water distribution line
B. Low battery voltage
C. Excessive system pressure
D. A defective faucet - ANSWER A. Unsecured water distribution line
4. What causes intermittent hot and cold water at all faucets?
A. Bypass water heater
B. Defective shower hose
C. Open water heater bypass valve
D. Water heater just turned on - ANSWER C. Open water heater
distribution valve
5. The size of hose in a freshwater distribution system is determined by
A. The number of fixtures in the distribution system
, The number of fixtures in the distribution system
The water pressure from the city water system
The water pressure from the city water system
The size of the fresh water storage tank - ANSWER A. The number of fixtures
in the distribution system
6. When replacing a solid waste holding tank and individual monitor probes,
the probes should be installed
A. Vertically
B. Horizontally
C. Diagonally
D. In any direction - ANSWER C. Diagonally
7. Of the steps listed below, the FIRST step in replacing a solid waste holding
tank is to
A. Remove the internal monitor panel probes
B. Open the termination valve
C. Disconnect the sewer flusher
D. Rinse the tank - ANSWER B. Open the termination valve
8. Technician A says that contracting the HIV AIDS virus is possible from
working with wastewater. Technician B says that there are minimal health
risks associated with contact with human waste. Which technician is correct?
A. Technician A
B. Technician B
C. Both technicians are correct
D. Neither technician is correct - ANSWER B. Technician b
9. When mounting a replacement exterior aluminum panel, it must -
ANSWER have a 1/16" to 1/8" seam gap