Geschreven door studenten die geslaagd zijn Direct beschikbaar na je betaling Online lezen of als PDF Verkeerd document? Gratis ruilen 4,6 TrustPilot
logo-home
Tentamen (uitwerkingen)

VA DEQ ESC INSPECTOR EXAM NEWEST EXAM / VA DEQ ESC INSPECTOR EXAM PREPARATION/VA DEQ ESC INSPECTOR PRACTICE EXAM WITH COMPLETE QUESTIONS AND CORRECT ANSWERS| BRAND NEW VERSION!

Beoordeling
-
Verkocht
-
Pagina's
29
Cijfer
A+
Geüpload op
15-02-2026
Geschreven in
2025/2026

VA DEQ ESC INSPECTOR EXAM NEWEST EXAM / VA DEQ ESC INSPECTOR EXAM PREPARATION/VA DEQ ESC INSPECTOR PRACTICE EXAM WITH COMPLETE QUESTIONS AND CORRECT ANSWERS| BRAND NEW VERSION!

Instelling
Vak

Voorbeeld van de inhoud

VA DEQ ESC INSPECTOR EXAM NEWEST EXAM / VA DEQ ESC
INSPECTOR EXAM PREPARATION/VA DEQ ESC INSPECTOR
PRACTICE EXAM WITH COMPLETE QUESTIONS AND
CORRECT ANSWERS| BRAND NEW VERSION!


VESCP - CORRECT ANSWERS-Virginia Erosion and Sediment Control Program



- Administered by counties/cities (must), towns (may)

- MUST BE APPROVED



Minimum Standard 1 - CORRECT ANSWERS-Stabilization



permanent or temporary soil stabilization shall be applied to denuded areas within seven days after final
grade is reached on any portion of the site; temporary soil stabilization shall be applied within seven
days to denuded areas that may not be at final grade but will remain dormant for longer than 14 days;
permanent stabilization shall be applied to areas that are to be left dormant for more than one year



Site NOT at Final Grade - CORRECT ANSWERS-- stabilize in 14 days

- temporarily seed

- mulch

- permanently stabilize if dormant > 1 year



Site at Final Grade - CORRECT ANSWERS-- stabilize in 7 days (recommended immediately)

- permanently or temporarily seed and mulch

- mulch/matting/straw



Minimum Standard 2 - CORRECT ANSWERS-Stock Piles, Waste and Borrow Areas



during construction, soil stock piles and borrow areas shall be stabilized or protected with sediment
trapping measures

,mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts and
detains from disturbed areas



Minimum Standard 3 - CORRECT ANSWERS-Permanent Vegetation



permanent vegetation cover shall be established on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be considered established until a ground cover is achieved
that is uniform, mature enough to survive, and will inhibit erosion *there is no % associated with this*)



reduce erosion and decrease sediment yield from disturbed area



this is the standard used to verify that a site is ready for release of bonds or surety



Minimum Standard 4 - CORRECT ANSWERS-First-Step Measures



Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to trap
sediment shall be constructed as a first step in any land-disturbing activity and shall be made functional
before upslope land disturbance takes place



a certain amount of initial land disturbance may be required to provide access for equipment to install
the perimeter controls, but site clearing and grading should be kept to a minimum until the perimeter
controls are in place



intercepts and detains small amounts of sediment from disturbed areas during construction operation to
prevent sediment from leaving the site and decrease velocity of sheet flows and low-to-moderate level
channel flow



Perimeter Controls - CORRECT ANSWERS-assures that sediment does not leave the perimeter
of the land-disturbing area once site clearing, grading, and construction commences



Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary diversions,
diversions

, Minimum Standard 5 - CORRECT ANSWERS-Earthen Structure Stabilization



stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions
immediately after installation



reduce erosion and sedimentation and reduce damage from sediment and runoff to downstream or off-
site areas



Minimum Standard 6 - CORRECT ANSWERS-Traps and Basins



sediment traps and basins shall be designed and constructed based upon the total drainage area (not
just disturbed area) to be served by the trap or basin



Sediment Traps - CORRECT ANSWERS-minimum storage capacity shall be 134 cubic yards per
acre of drainage area and shall only control drainage areas less than 3 acres



*stone outlet = trap*



Sediment Basins - CORRECT ANSWERS-surface runoff from disturbed areas that is comprised
of flow from drainage areas greater than or equal to 3 acres shall be controlled by a basin; minimum
storage capacity of a sediment basin shall be 134 cubic yards per acre of drainage area; the outfall
system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm of 24-
hour duration; runoff coefficients used in runoff calculations shall correspond to a bare earth condition
or those conditions expected to exist while the sediment basin is utilized.



Sediment Trapping Devises - CORRECT ANSWERS-1. place near the lowest drainage points of
a project



2. install as a first-step measure [MS-4]



3. stabilize immediately [MS-5]

Geschreven voor

Vak

Documentinformatie

Geüpload op
15 februari 2026
Aantal pagina's
29
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$24.99
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
september10

Maak kennis met de verkoper

Seller avatar
september10 Teachme2-tutor
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
1
Lid sinds
1 jaar
Aantal volgers
0
Documenten
710
Laatst verkocht
1 maand geleden
september 10

AFTER MULTIPLE TONES OF RESEARCH THE MAIN AIM IS TO OFFER NOTHING BUT THE BEST FOR THE LEANERS IN A WORLD WHERE WISDOM IS VALUED THESE TESTS ARE A CONFIRMATION OF SUCCESS.THE RESOURSES ARE THOUGHTFULLY PREPARED TO SUPPORT YOU LEARNING JOURNEY AND MAKE YOUR STUDIES AND EXAM PREPARATION SMOOTH AND EFFECTIVE.

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen