ASSURANCE CERTIFICATION EXAM 2026
QUESTIONS WITH SOLUTIONS GRADED A+
◉ What company became the sole supplier for critical 737 components
after Boeing's outsourcing? Answer: Spirit AeroSystems.
◉ What warning did Boeing engineer John Hart Smith present in 2001?
Answer: He warned against the outsourcing strategy, stating that
performance cannot exceed the capabilities of the least proficient
suppliers.
◉ What cultural shift occurred at Boeing around 2017? Answer: A shift
towards prioritizing speed over quality to catch up with Airbus.
◉ What practices emerged from Boeing's culture of prioritizing speed?
Answer: Inspector shopping and self-verification, where mechanics
signed off on their own work.
◉ What did Boeing's CFO admit regarding the company's priorities?
Answer: He admitted that they prioritized the movement of airplanes
through the factory over getting it done right.
, ◉ What was the impact of the loss of veteran staff at Boeing since the
pandemic? Answer: A massive loss of experience, with over 1700
veteran engineers leaving the company.
◉ What is 'traveled work' in the context of Boeing's operations? Answer:
Traveled work refers to completing work out of its ordinary sequence to
keep the production line flowing.
◉ What was the flaw in the fuselage received from Spirit for Line No.
8789? Answer: The fuselage arrived with damaged rivets.
◉ What critical error occurred due to missing documentation in the
repair process? Answer: No official 'removal' documentation was
created, preventing a quality-assurance inspection.
◉ What was the consequence of not documenting the 'removal' process?
Answer: The quality check to ensure the door plug was reinstalled
correctly never happened.
◉ What leadership changes occurred in the fallout of the 737 MAX
crisis? Answer: Boeing's CEO and the head of the 737 MAX program
announced they would step down.