1. What are the 4 DB Team Integration roles? - Correct Answer: 1. Integrated Project Leader
(DB - PM).
2. Designer of Record (A/E).
3. Design Manager.
4. Estimator (A/E).
2. Who leads the project team and manages team dynamics?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - Correct Answer: a) Integrated Project Leader
3. Who balances the Owner's needs plus design and construction?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - Correct Answer: a) Integrated Project Leader
,4. Who is licensed to protect the health, safety and welfare of the public?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - Correct Answer: b) Designer of Record
5. Who leads the overall design effort or design and engineering of a specific discipline?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - Correct Answer: b) Designer of Record
6. Who facilitates "Marriage" between design professionals and cost estimators?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - Correct Answer: c) Design Manager
7. Who advocates for design excellence within the DB team?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - Correct Answer: c) Design Manager
8. Who manages design information flow & deliverables?
a) Integrated Project Leader
, b) Designer of Record
c) Design Manager
d) Estimator - Correct Answer: c) Design Manager
9. Who manages design performance interface?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - Correct Answer: b) Designer of Record
10. The Integrated Project Leader is a traditional hard-bid project manager.
True or False? - Correct Answer: False
11. Who has to perform their design services within a common "Standard of Care"?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - Correct Answer: b) Designer of Record
12. Who are considered to be "trained creative problem solvers"?
a) Integrated Project Leader
b) Designer of Record
c) Design Manager
d) Estimator - Correct Answer: b) Designer of Record