You are inspecting a construction a. Clay
site and notice that the soil appears
to be a fine-grained, cohesive
material with good bearing capacity.
What type of soil is this likely to be?
a. Clay
b. Sand
c. Gravel
d. Loam
,You are inspecting the clearing and d. Request that the tree be replaced, but do not
grubbing of a construction site and issue a stop work order
notice that a large tree has been
removed within the limits of
disturbance. What should you do?
a. Notify the project manager and
request that a replacement tree be
planted
b. Document the removal in the
construction logs and move on
c. Issue a stop work order until a
replacement tree can be planted
d. Request that the tree be replaced,
but do not issue a stop work order
You are inspecting the placement of b. Notify the project manager and request that the
an embankment and notice that the compaction be corrected
compaction is below the required
specification. What should you do?
a. Accept the work and move on
b. Notify the project manager and
request that the compaction be
corrected
c. Issue a stop work order until the
compaction can be corrected
d. Document the issue in the
construction logs and move on
,You are asked to calculate the d. All of the above
excavation and embankment
quantities for a construction project.
What information do you need to
complete this task?
a. The dimensions of the excavation
and embankment areas
b. The weight of the soil and other
materials
c. The density of the soil and other
materials
d. All of the above
You are inspecting a construction c. Issue a stop work order until the controls can be
site and notice that temporary corrected
erosion and sediment controls are
not properly installed. What should
you do?
a. Accept the work and move on
b. Notify the project manager and
request that the controls be
corrected
c. Issue a stop work order until the
controls can be corrected
d. Document the issue in the
construction logs and move on
, You are inspecting the placement of b. Notify the project manager and request that the
a subgrade and notice that the undercutting be corrected
undercutting is not to the specified
depth. What should you do?
a. Accept the work and move on
b. Notify the project manager and
request that the undercutting be
corrected
c. Issue a stop work order until the
undercutting can be corrected
d. Document the issue in the
construction logs and move on
You are asked to determine the c. The compaction meets or exceeds both the
acceptability of the results of a soil specified density and moisture content
compaction test. What criteria should
you use to make this determination?
a. The compaction meets or exceeds
the specified density
b. The compaction meets or exceeds
the specified moisture content
c. The compaction meets or exceeds
both the specified density and
moisture content
d. The compaction meets or exceeds
the specified density or moisture
content
ACCURATE ANSWERS | MULTIPLE CHOICES |!!
Save
Terms in this set (200)
You are inspecting a construction a. Clay
site and notice that the soil appears
to be a fine-grained, cohesive
material with good bearing capacity.
What type of soil is this likely to be?
a. Clay
b. Sand
c. Gravel
d. Loam
,You are inspecting the clearing and d. Request that the tree be replaced, but do not
grubbing of a construction site and issue a stop work order
notice that a large tree has been
removed within the limits of
disturbance. What should you do?
a. Notify the project manager and
request that a replacement tree be
planted
b. Document the removal in the
construction logs and move on
c. Issue a stop work order until a
replacement tree can be planted
d. Request that the tree be replaced,
but do not issue a stop work order
You are inspecting the placement of b. Notify the project manager and request that the
an embankment and notice that the compaction be corrected
compaction is below the required
specification. What should you do?
a. Accept the work and move on
b. Notify the project manager and
request that the compaction be
corrected
c. Issue a stop work order until the
compaction can be corrected
d. Document the issue in the
construction logs and move on
,You are asked to calculate the d. All of the above
excavation and embankment
quantities for a construction project.
What information do you need to
complete this task?
a. The dimensions of the excavation
and embankment areas
b. The weight of the soil and other
materials
c. The density of the soil and other
materials
d. All of the above
You are inspecting a construction c. Issue a stop work order until the controls can be
site and notice that temporary corrected
erosion and sediment controls are
not properly installed. What should
you do?
a. Accept the work and move on
b. Notify the project manager and
request that the controls be
corrected
c. Issue a stop work order until the
controls can be corrected
d. Document the issue in the
construction logs and move on
, You are inspecting the placement of b. Notify the project manager and request that the
a subgrade and notice that the undercutting be corrected
undercutting is not to the specified
depth. What should you do?
a. Accept the work and move on
b. Notify the project manager and
request that the undercutting be
corrected
c. Issue a stop work order until the
undercutting can be corrected
d. Document the issue in the
construction logs and move on
You are asked to determine the c. The compaction meets or exceeds both the
acceptability of the results of a soil specified density and moisture content
compaction test. What criteria should
you use to make this determination?
a. The compaction meets or exceeds
the specified density
b. The compaction meets or exceeds
the specified moisture content
c. The compaction meets or exceeds
both the specified density and
moisture content
d. The compaction meets or exceeds
the specified density or moisture