PJM GENERATION OPERATION EXAM ACTUAL 2026 QUESTIONS AND VERIFIED ANSWERS Control center facilities must have a minimum of how many days of fuel for the backup generator? - Answer -5 days If PJM ACE shows overgeneration, actual imports are: - Answer -Less than scheduled Who should a generator contact at PJM to clear an outage ticket? - Answer -Master Coordinator To correct for a slow or fast clock, system frequency schedules are offset by: - Answer -+/-.02 Hz