Fuel Gas Code Exam Review Bundle Containing 650
Recently Tested Questions and Correct Answers /
IFGC Exam Latest Packet for the IFGC 2026 Exam
Preparation
appliance
(Section 101.2.2 Piping Systems) - ..ANSWER...✓✓ The
IFGC covers gas piping from the point of delivery to the
outlet of the shutoff valves.
this code
(Section 102.8.1 Provisions in referenced codes and
standards) - ..ANSWER...✓✓ Where conflicts occur
between the provisions of this code and the referenced
standards, the provisions of the __________ ____________
shall apply.
modifications (Section 105.1 Modifications) -
..ANSWER...✓✓ Whenever there are practical difficulties
involved in carrying out the provisions of this code, the
,2|Page
code official shall have the authority to grant __________
for individual cases.
in writing,
reason for disapproval
(Section 105.2 Alternative materials, design and methods
of construction and equipment.) - ..ANSWER...✓✓ Where
the code official finds that a proposed alternative material
does not comply with the intent of the code provisions,
the code official shall respond __________ __________
stating the __________ __________ _________.
next working
(section 106.1 Where required, Exception) -
..ANSWER...✓✓ Where appliance and equipment
replacements and repairs are required to be performed in
an emergency situation, the permit application shall be
submitted within the _________ ___________ business day of
Department of Inspection.
portable
,3|Page
(Section 106.2. Permits not required, Item 1.) -
..ANSWER...✓✓ Permits shall not be required for any
_________ heating appliance.
permit
(Section 106.5 Permit issuance) - ..ANSWER...✓✓ The
application, construction documents and other data filed
by an applicant for a __________ shall be reviewed by the
code official.
180
(Section 106.5.3 Expiration, Section 106.5.4 Extensions) -
..ANSWER...✓✓ Every permit issued by the code official
under the provisions of this code shall expire by limitation
and become null and void if the work authorized is not
commenced within _____ days.
180
, 4|Page
(Section 107.2 Retention of construction documents) -
..ANSWER...✓✓ One set of approved construction
documents shall be retained by the code official for a
period of not less than _____ days from the date of
completion of the permitted work, or as required by state
or local laws.
inspection,
inspection
(Section 112.1 General) - ..ANSWER...✓✓ Construction or
work for which a permit is required shall be subject to
_________ by the code official, and such construction or
work shall remain visible and able to be accessed for
__________ purposes until approved.
authorized
(Section 110.1 Connection of service utilities) -
..ANSWER...✓✓ A person shall not make connections
from a utility, source of energy, fuel or power to any
building or system that is regulated by this code for which
a permit is required until __________ by the code official.