which of the following is not considered desirable for use with
plans and specifications - ANSWER-government specifications
an effective campus master plan should incorporate the
institutions utility, landscape, and sustainability plan as well as the
- ANSWER-academic strategic plan
programming, inspections, scheduling, and punch lists are typical
duties for - ANSWER-project managers PM
compliance and code enforcement are critical campus elements
that should be effectively addressed by what typical campus
department - ANSWER-risk management/environmental health
and safety
,2|Page
reduction of change orders on construction contracts can be
better managed by use of - ANSWER-construction management
at risk delivery method
some institutions are allowed to use other construction and
delivery methods besides traditional design/bid/build. select one
such method that can save time - ANSWER-design-build
space planning standards are effective and incorporate academic
space types that are referred to as - ANSWER-HEGIS codes
utility master plans are critical in mapping all utilities above and
below grade using current technology - ANSWER-Geographic
Information System (GIS)
the process of commissioning a new facility begins at what stage -
ANSWER-schematic design SD
,3|Page
value engineering VE measures for construction and projects
includes consideration for - ANSWER-means, methods, and
materials
the best approach coming into this situation is the following -
ANSWER-look/learn/listen then develop short, medium, and long
term goals to share with staff
what is the best method for assessing the current facilities
management culture on campus - ANSWER-conduct a culture
climate survey
what is the best method for assessing current customer
satisfaction - ANSWER-conduct a customer satisfaction survey for
key service users
which attitude is a major contributor to space inefficiency -
ANSWER-space is free
, 4|Page
which is a key element of the building program for a new facility -
ANSWER-user requirements
which important component of a facility program provides a
unique way to communicate baseline information about every
space in a building program - ANSWER-room or space data
sheets
which financing option for a new facility would be best in a strong
economy with stable interest rates - ANSWER-variable rate
financing
a projects stakeholders want to identify conflicts and prioritize
needs to stay within budget. what should be performed before any
design begins - ANSWER-facility programming
a manager of utilities is asked to develop a budget to connect a
new building to the campus utility system. the first step is to -
ANSWER-obtain a survey showing all existing utility locations