What does this permit regulate? Discharges of pollutants in storm water associated
with construction activity (storm water discharges)
to waters of the united states from construction
site that disturb one or more acres of land surface,
or that are part of a common plan of development
or sale that disturbs more than one acre of land
surface.
The person in charge of the utility LUP
company, municipality, or other
public or private company or agency
that owns or operates the __________
may also serve as the LRP.
Sediment basins, at a minimum, shall True
be designed according to the
CASQA Construction BMP Guidance
Handbook.
In the RUSLE equation, "P" stands for Management operations and support practices.
, Management operations and Management operations and support practices.
support practices.
When does risk level one has to When required for non-visible pollutants.
sample?
ATS instruments shall record which Flow, turbidity, and pH
of the following?
Which factor(s) of RUSLE can be K and LS
based on site-specific analysis rather
than maps?
Failure to obtain coverage under the Clean Water Act and California Water Code
permit for storm water discharges to
waters of the US is a violation of the
For traditional construction projects The person who possesses real properly interest in
the LRP may be the land upon which the construction activities will
occur for the regulated site
What does NTU measure? a measurement of optical properties of a liquid that
cause light rays to be scattered and absorbed
rather than transmitted in straight lines through a
sample.
Inspection Records have to be kept False
until the project is complete or three
years, whichever comes first.
Which factor(s) of RUSLE must be R
changed to recalculate risk when the
construction duration has changed?
(questions and verified answers)frequently most
tested questions | already passed!!
Save
Terms in this set (73)
What does this permit regulate? Discharges of pollutants in storm water associated
with construction activity (storm water discharges)
to waters of the united states from construction
site that disturb one or more acres of land surface,
or that are part of a common plan of development
or sale that disturbs more than one acre of land
surface.
The person in charge of the utility LUP
company, municipality, or other
public or private company or agency
that owns or operates the __________
may also serve as the LRP.
Sediment basins, at a minimum, shall True
be designed according to the
CASQA Construction BMP Guidance
Handbook.
In the RUSLE equation, "P" stands for Management operations and support practices.
, Management operations and Management operations and support practices.
support practices.
When does risk level one has to When required for non-visible pollutants.
sample?
ATS instruments shall record which Flow, turbidity, and pH
of the following?
Which factor(s) of RUSLE can be K and LS
based on site-specific analysis rather
than maps?
Failure to obtain coverage under the Clean Water Act and California Water Code
permit for storm water discharges to
waters of the US is a violation of the
For traditional construction projects The person who possesses real properly interest in
the LRP may be the land upon which the construction activities will
occur for the regulated site
What does NTU measure? a measurement of optical properties of a liquid that
cause light rays to be scattered and absorbed
rather than transmitted in straight lines through a
sample.
Inspection Records have to be kept False
until the project is complete or three
years, whichever comes first.
Which factor(s) of RUSLE must be R
changed to recalculate risk when the
construction duration has changed?