The foundations of the Program Protection Plan include:
Give this one a try later!
Mission-Critical Function and Components
Critical Program Information
Performance metrics are ________ to user-defined capabilities.
Give this one a try later!
traceable
Flexibility
,Give this one a try later!
implies how brittle the code is to change. As a result, I tie the terms
flexibility and test-ability into the overall maintainability of a project.
Standards: Provide an organization with a set of processes that, if done by qualified
persons using appropriate_________ , will provide a capability to do __________ engineering
of systems, including their software components.
Give this one a try later!
tools and methods, effective and efficient
Two software testing categories:
Give this one a try later!
Human-based testing
Computer-based testing
The common development approaches include:
Give this one a try later!
, Waterfall
Incremental
Spiral
Agile
A Software Item (SI) is a grouping of software that satisfies an__________. It is specifically
designated as an SI for purposes of specification, __________________, interfacing or other
purposes.
Give this one a try later!
end-use function,qualification
Software quality is often measured in terms of the number of faults, or bugs, present
in a product.
Give this one a try later!
in terms of the number of faults, or bugs, present in a product.
An Open Systems Architecture (OSA)
Give this one a try later!
as the preferred technical approach and business strategy for the
acquisition of all weapons system electronics
Give this one a try later!
Mission-Critical Function and Components
Critical Program Information
Performance metrics are ________ to user-defined capabilities.
Give this one a try later!
traceable
Flexibility
,Give this one a try later!
implies how brittle the code is to change. As a result, I tie the terms
flexibility and test-ability into the overall maintainability of a project.
Standards: Provide an organization with a set of processes that, if done by qualified
persons using appropriate_________ , will provide a capability to do __________ engineering
of systems, including their software components.
Give this one a try later!
tools and methods, effective and efficient
Two software testing categories:
Give this one a try later!
Human-based testing
Computer-based testing
The common development approaches include:
Give this one a try later!
, Waterfall
Incremental
Spiral
Agile
A Software Item (SI) is a grouping of software that satisfies an__________. It is specifically
designated as an SI for purposes of specification, __________________, interfacing or other
purposes.
Give this one a try later!
end-use function,qualification
Software quality is often measured in terms of the number of faults, or bugs, present
in a product.
Give this one a try later!
in terms of the number of faults, or bugs, present in a product.
An Open Systems Architecture (OSA)
Give this one a try later!
as the preferred technical approach and business strategy for the
acquisition of all weapons system electronics