and Correct Detailed Answers Already Graded A+
If the MSSC for a BA is 800 MW, what is the DCS reporting threshold?
A) 240 MW
B) 640 MW
C) 840 MW
D) 300 MW - CORRECT ANSWER-B) 640 MW (80 %)
A BA that is part of a multiple BA Interconnection that is not receiving overlap
regulation and uses a fixed Frequency Bias Setting must have its calculated setting
validated by the - CORRECT ANSWER-ERO (Electric Reliability Organization)
The Frequency Bias Setting for a Balancing Area must be expressed in?
,A) MW/0.1 Hz
B) MW/0.5 Hz
C) MW/0.01 Hz
D) MW/0.05 Hz - CORRECT ANSWER-A) MW/0.1 Hz
Units with nameplate ratings of _____ or greater should be equipped with
governors.
A) 25 MW
B) 15 MW
C) 10 MW
D) 50 MW - CORRECT ANSWER-C) 10 MW
,There are how many ways to make adjustments for a time error correction?
A) 2
B) 3
C) 5
D) 6 - CORRECT ANSWER-A) 2
Who can serve as an Interconnection Time Monitor? - CORRECT ANSWER-Only
Reliability Coordinators
BAs use ______ to automatically direct the loading of regulating reserves on their
system. - CORRECT ANSWER-AGC (Automatic Generation Control)
The MSSC for your BA is 650 MW. Your reporting threshold is > 520 MW. (650 x
80%). What is the percent of recovery for the following situation?
, Loss of a 575 MW unit
Pre-disturbance Ace = 150 MW
Post-recovery Ace = 10 MW - CORRECT ANSWER-+150 + (-575) = -425
-425 + (x) = 10, x= 435
435/425= 100%
The MSSC for your BA is 650 MW. Your reporting threshold is >/equal to 520 MW.
(650 x 80%) What is the percent of recovery for the following situation?
Loss of a 600 MW unit
Pre-disturbance Ace = 150 MW
Post-recovery Ace = -50MW - CORRECT ANSWER-+150 + (-600) = -450
-450 + (x) = -50, x= 400
400/450= 89%