Measurements ACTUAL Exam MSSC 4.0 Quality Practices & Measurements
EXAM COVERAGE
Quality Management Systems & Continuous
Improvement (Lean, Six Sigma, PDCA)
Root Cause Analysis & Corrective Actions (5
Whys, CAPA)
Statistical Process Control (SPC) & Control
Charts
Process Capability (Cp, Cpk) & Data
Interpretation
Measurement Systems, Calibration &
Precision Tools
Blueprint Reading & GD&T Basics
Inspection Methods, Sampling &
, Nonconformance
Quality Documentation, Safety & Regulatory
Compliance
Spreadsheets are used to Rows and columns
perform calculations in ____.
Spreadsheets are used to form graphs
___.
To make sure the appropriate Predetermined distribution list
parties are notified, use a
__________.
First piece inspection is required Documenting repeatable setups
for __________.
,To identify and eliminate waste A continuous improvement environment
activities proves a company is
operating in __________.
A history of dependability and Evaluating a potential supplier
customer satisfaction should be
considered when __________.
Of the four roles of Monitoring actual to standard work
management, controlling performance
covers:
To reduce variation, minimize Quality
defects, and to shorten cycle
time are considered __________
goals.
, Everyone within an organization Improving
is responsible for __________ quality.
Product development teams Design Failure Mode and Effects Analysis
should perform a(n) __________ as
early as possible during their
design process.
Design failure mode and effects systematic group of activities used to
analysis (DFMEA) recognize and evaluate potential systems,
products or process failures
Greater variations in a process Unapproved process adjustments are
may occur when __________. performed