ACG GUIDELINE EXAM PREP 100 VERIFIED QUESTIONS AND ANSWERS UPDATED 2026 QUESTIONWhat does DID mean and provide a brief definition? - answer-Design Intent Document - Details functional requirements and Owner's expectations of how a building will be used and operated - Owner's Project Requirements QUESTIONWhat does BOD mean and provide a brief definition? - answer-Basis of Design - The concepts, calculations, decisions, and product selections used to meet the Owner's Project Requirements. What are the five phases of commissioning? - answer-1.) Pre Design 2.) Design 3.) Construction 4.) Acceptance 5.) Post-Acceptance

Meer zien Lees minder
Instelling
ACG
Vak
ACG

Voorbeeld van de inhoud

ACG GUIDELINE EXAM PREP
100 VERIFIED QUESTIONS
AND ANSWERS UPDATED
2026

QUESTIONWhat does DID mean and provide a brief definition? -
answer-Design Intent Document - Details functional requirements
and Owner's expectations of how a building will be used and
operated - Owner's Project Requirements

QUESTIONWhat does BOD mean and provide a brief definition? -
answer-Basis of Design - The concepts, calculations, decisions,
and product selections used to meet the Owner's Project
Requirements.

What are the five phases of commissioning? - answer-1.) Pre-
Design
2.) Design
3.) Construction
4.) Acceptance
5.) Post-Acceptance

QUESTIONStudies indicate _ to _% savings in building operating
costs when comparing a comissioned building to a non-
commissioned building. - answer-8 to 20%

QUESTIONWhat is commissioning? - answer-A process of
documentation, adjustment, testing, verification, and training

,performed specifically to ensure that the finished facility operates
in accordance with the owner's documented project requirements
and the construction documents. Commissioning serves the
owner's best interests by delivering a facility with systems that
perform as specified, intended, and paid for.


QUESTIONDesigner's (A/E) services typically (do or do not)
include field verification that their design works as intended. -
answer-Do NOT

QUESTIONConstruction Manager's services typically (do or do
not) include functional verification that the installed systems meet
design intent. - answer-Do NOT

QUESTIONThe CxA has a distinct responsibility to who? -
answer-The Owner

QUESTIONThe CxA is not just another layer of inspection, but a
catalyst for? - answer-Communication that makes quality
solutions possible.

QUESTIONThe CxA (is or is not) an inspector. - answer-Is NOT

QUESTIONThe commissioning process provides verification that
the ____ ____ ____ are implemented in both the ____ and ____.
- answer-Owner's Project Requirements; Design and Construction

QUESTIONNew construction commissioning costs _ to _% of
total construction cost. - answer-0.5 to 1.5%

QUESTIONRetrocommissioning costs _ to _% of total operation
cost. - answer-3 to 5%

, QUESTIONNew construction commissioning costs _ to _% of
total mechanical system construction cost. - answer-2 to 3%

QUESTIONNew construction commissioning costs _ to _% of
total electrical system construction cost. - answer-1 to 2%

QUESTIONNew construction commissioning costs _ to _% of
total comprehensive HVAC construction cost. - answer-2 to 5%

QUESTIONWhat does CxA mean and what is the CxA's job
function? - answer-ACG Certified Commissioning Authority;
leader of the commissioning team that represents the facility
owner.

QUESTIONWhat does CP mean and indicate a few examples of
providers (5 listed). - answer-Commissioning Provider;
1.) Independent third-party commissioning firm
2.) A/E firm
3.) General contractor
4.) Construction manager
5.) Owner's personnel

QUESTIONWhat is retro-commissioning (RetroCx)? - answer-
Commissioning an existing building that has never been
commissioned.

QUESTIONWhat is re-commissioning (ReCx)? - answer-
Commissioning a building that has been previously
commissioned.

QUESTIONWhat is continuous commissioning (CCx)? - answer-
Owner continues to collect and compare baseline data on
selected building systems to ensure that the building functions
optimally throughout its operating life.

Geschreven voor

Instelling
ACG
Vak
ACG

Documentinformatie

Geüpload op
23 februari 2026
Aantal pagina's
16
Geschreven in
2025/2026
Type
Tentamen (uitwerkingen)
Bevat
Vragen en antwoorden

Onderwerpen

$26.39
Krijg toegang tot het volledige document:

Verkeerd document? Gratis ruilen Binnen 14 dagen na aankoop en voor het downloaden kun je een ander document kiezen. Je kunt het bedrag gewoon opnieuw besteden.
Geschreven door studenten die geslaagd zijn
Direct beschikbaar na je betaling
Online lezen of als PDF

Maak kennis met de verkoper
Seller avatar
idahmunene20

Maak kennis met de verkoper

Seller avatar
idahmunene20 Georgia College & State University
Volgen Je moet ingelogd zijn om studenten of vakken te kunnen volgen
Verkocht
5
Lid sinds
2 jaar
Aantal volgers
4
Documenten
533
Laatst verkocht
6 maanden geleden

0.0

0 beoordelingen

5
0
4
0
3
0
2
0
1
0

Recent door jou bekeken

Waarom studenten kiezen voor Stuvia

Gemaakt door medestudenten, geverifieerd door reviews

Kwaliteit die je kunt vertrouwen: geschreven door studenten die slaagden en beoordeeld door anderen die dit document gebruikten.

Niet tevreden? Kies een ander document

Geen zorgen! Je kunt voor hetzelfde geld direct een ander document kiezen dat beter past bij wat je zoekt.

Betaal zoals je wilt, start meteen met leren

Geen abonnement, geen verplichtingen. Betaal zoals je gewend bent via iDeal of creditcard en download je PDF-document meteen.

Student with book image

“Gekocht, gedownload en geslaagd. Zo makkelijk kan het dus zijn.”

Alisha Student

Bezig met je bronvermelding?

Maak nauwkeurige citaten in APA, MLA en Harvard met onze gratis bronnengenerator.

Bezig met je bronvermelding?

Veelgestelde vragen