CESSWI PART 2 2026 QUESTIONS
AND ANSWERS | A+ GRADED | WITH
EXPERT SOLUTIONS
Existing Veg, Desc/Purp - correct answer-temp or perm bmp desi
to stab soil and remove sups part from sheet flow runoff.
Existing Veg, Objectives - correct answer-1) Site Plan and Mang
2) Erosi Cont
3) Sedi Cont
4) Post-Cons Mang
Existing Veg, applic - correct answer-1) Areas within site where
no const activity is occur
2) Areas where local, state and fed govt require preservation
3) Areas where existing veg can be utilized for eros, sedi, and
storm water quality.
Existing veg: inspection - correct answer-1) Accord to regu
timetables
, Page | 2
2) erosi and damage veg
3) sufficient moisture to ensure growth
4) veg is well stab
5) adequate cover
6) debris and litter
7) invasive exotics
Existing veg: maint - correct answer-1) only disturb area for
construct
2)irrigate dry seasons
3) remove see, and replant if need be
4) replant or rework buffer strips
5) mow and cut perennial weeds
6) remove all trash and debri
7) treat invasive and noxious species
Sched/Sequ, purp/descrip - correct answer-Temp, procedural
control that involves creating a written plan to address neck bmps
and sequencing of construct activities to mitigate the erosive
effects of wind,water and construct activities.
, Page | 3
Sched/Sequ: object - correct answer-1) site planning &
management
2) erosion control
3) sediment control
Sched/Sequ: applications - correct answer-1) develop timetables
for certain activities, paretic during rainy season
Sched/Sequ: inspect - correct answer-1) inclusion of sched/seq
as a bmp in the plan
2) ached site activities mirroring ached activites.
Sched/Sequ: maintanence - correct answer-1) modify ached of
active when changes are warranted
2) modify ached of active prior to rainy season to reflect updated
bmp info
Hydroseed: Des& purp - correct answer-Temp or perm bmp
designed to reduce erosion and runoff by applying mix of seed,
fert and stabilizing emulsion.
, Page | 4
Hydroseed: object - correct answer-1) erosion control
2) good housekeeping/ materials management
3) post construct management
Hydroseed: targeted pollut - correct answer-1) sediment
2) nutrients
3) metals
4) ph
Hydroseed: imp consid - correct answer-1) need adequate
moisture
2) additional mulch may be added
3) pretreatment where cover is not met
4) apply from multi angles to avoid shadowing
Hydroseed: limitations - correct answer-1) seed mix approp for
seasonal conditions
2) time of application per seasonal conditions
3) difficult on steep slopes
4) no pedestrian or vehicle traffic