,Ohio Sprinkler Technician Practice Test 2026-02-24
Hide definitions
For ESFR sprinklers, the clearance between sprinkler and the top of the storage shall be...
36 inches
Permits required for the removal of a standpipe system on state property, when not issued by the
local fire code official, shall be obtained from...
State fire marshal
Components that do not affect systems performance such as drain piping, drain valves, and signs
shall not be required to be listed...
True
Under certain circumstances, NFPA 13 allows the use of "other" types of pipe or tube materials
including...
CPVC
Page 2 Ohio Sprinkler Technician Practice Test.pdf
, Ohio Sprinkler Technician Practice Test 2026-02-24
The minimum operating pressure of any sprinkler head in a residential (13D) sprinkler system shall be
the higher of the minimum operating pressure specified by the listing or 7 PSI...
True
Equipment, materials, or services included in a list by an organization that us to the authority having
jurisdiction and concerned with evaluation of products or services, that maintains periodic
inspection of production of listed equipment or materials or periodic evaluation of services, and
whose listing states the either the equipment, materials, or services meets the appropriate
designated standards or has been tested and found suitable for a specified purpose is a definition
of...
Listed
Panel construction and other construction were beams, trusses and other members impede heat
flow or water distribution in a in a matter that materially affects the ability of sprinklers to control or
suppress fire is know as...
Obstructed construction