2026/2027 COMPLETE QUESTIONS WITH
VERIFIED CORRECT ANSWERS || 100%
GUARANTEED PASS | NEWEST VERSION
True or False? A labor laws placard must be posted. ------- ✔ CORRECT ANSWER ✓✓True
True or False? The GC shall ensure that all subcontractors and their workers have secured,
maintained, and complied with all required licenses, permits and certificates relating to, or
otherwise necessary or appropriate for, the performance and completion of the work and all
other activities and obligations under the Contract Documents. ------- ✔ CORRECT ANSWER
✓✓True
Which of the following is required to be present at the job site?
A. Safety Manual and up to date MSDS binder
B. SWPP certificate posted
C. Visitors sign in book
D. All of the Above ------- ✔ CORRECT ANSWER ✓✓All of the above
The SWPP implementation sequence may be modified? ------- ✔ CORRECT ANSWER ✓✓After
consulting with the project SWPP Designer (CEC) and, if required, the Project Owner and
receiving written approval.
True or False: the GC doesn't need to worry about access control after possession. ------- ✔
CORRECT ANSWER ✓✓False
, When installing perimeter BMP controls: ------- ✔ CORRECT ANSWER ✓✓Note locations and
dates of installation on the site map.
A SWPP Site Map will show all of the following except:
A. Locations of BMPs
B. Notices of Violation
C. Phasing and Sequence
D. Limits of Disturbance ------- ✔ CORRECT ANSWER ✓✓B. Notices of Violation C
In what circumstances must your company run newly hired employees through E-Verify? -------
✔ CORRECT ANSWER ✓✓Any new hire employees who will provide services to Walmart in a
mandatory E-Verify State: AL, AZ, GA, LA, MS, NC, SC, TN or UT.
Factors to consider when creating your schedule include: ------- ✔ CORRECT ANSWER
✓✓Account for the time it takes to install or implement BMP's between each phase of
construction
Which of the following is not a silt fence related deficiency?
A. Tears or holes in the fabric
B. Excessive sediment accumulation
C. Track out
D. Undercutting ------- ✔ CORRECT ANSWER ✓✓C. Trackout
Requirements for managing stormwater activity on a construction site are outlined in the
following regulation: ------- ✔ CORRECT ANSWER ✓✓NPDES
True or False: Subcontractors do not need a GC badge during the first week of construction as
this is the slowest time of the project. ------- ✔ CORRECT ANSWER ✓✓False