Michigan Demolition Contractor License Exam ACTUAL
Exam ALL 200 QUESTIONS AND CORRECT ANSWERS
LATEST UPDATE THIS YEAR
Michigan Demolition Contractor License
ACTUAL Exam – Batch 1 (Questions 1–50)
2026 Update | Verified Answers | With Rationales
Exam Coverage Areas:
• Licensing requirements and regulations
• Safety standards and OSHA compliance
• Pre-demolition planning and utility disconnections
• Hazardous materials handling (asbestos, lead, etc.)
• Demolition techniques and methods (manual, mechanical, implosion)
• Equipment operation and maintenance
• Waste disposal, recycling, and environmental compliance
• Insurance, bonding, and financial responsibilities
• Site security and public protection
1
, Page 2 of 83
• Recordkeeping, reporting, and legal obligations
1. Which of the following is the primary responsibility of a demolition contractor?
A. Designing residential structures
B. Safely dismantling structures
C. Installing plumbing systems
D. Landscaping
Answer: B
Rationale: Demolition contractors are responsible for safely dismantling or removing structures
while protecting workers and the public.
2. Before starting demolition, what is required by Michigan law regarding utilities?
A. Only gas must be shut off
B. All utilities must be properly disconnected
C. Only electricity must be disconnected
D. Utilities can remain active
Answer: B
Rationale: Disconnecting all utilities—including electricity, gas, water, and sewer—is essential
to prevent accidents.
2
, Page 3 of 83
3. What is the minimum insurance a Michigan demolition contractor must carry?
A. Auto insurance
B. General liability insurance
C. Homeowner's insurance
D. Life insurance
Answer: B
Rationale: General liability insurance protects against property damage or injuries during
demolition work.
4. Which federal agency sets safety standards that Michigan demolition contractors must
follow?
A. EPA
B. OSHA
C. DOT
D. FDA
Answer: B
Rationale: OSHA establishes workplace safety regulations for construction and demolition
activities.
3
, Page 4 of 83
5. What is the first step in planning a demolition project?
A. Begin dismantling structures
B. Conduct a site assessment and hazard evaluation
C. Rent equipment
D. Notify neighbors
Answer: B
Rationale: Evaluating hazards and planning procedures ensures safety and compliance before
demolition begins.
6. When dealing with asbestos-containing materials, a contractor must:
A. Remove it without protective gear
B. Follow specific federal and state abatement regulations
C. Dispose of it in any landfill
D. Burn it on site
Answer: B
Rationale: Asbestos abatement must follow strict safety and disposal protocols to prevent
exposure.
7. Lead paint removal during demolition requires:
A. No precautions