33 final exam Questions and Answers.
working load - Answer the external load, in pounds (kilograms), applied to a crane or derrick,
including the weight of auxiliary load attaching equipment, such as lower load blocks, shackles
and slings can be best defined as
a mast or equivalent member held at the end by guys or braces, with or without a boom -
Answer a derrick can be best described as having
all of the above - Answer whenever design is specifically required in new york city's chapter
33, such design shall
75 - Answer whenever construction reaches a height greater than how many feet, at least
one elevator must be kept in readiness for the fire department?
75 - Answer a standpipe riser, with new york city fire department threads, must be installed
whenever construction reaches a height of greater than how many feet
immediately by the permit holder, or a duly authorized representative - Answer the
department of buildings shall be notified of an accident at a construction or demolition site, or
any damage to adjoining property caused by construction or demolition activity at the site.
all of the above - Answer the posting of project information panels must be
remote controlled equipment - Answer during demolition operations, a handheld device
does not include
hand tools - Answer according to chapter 33 of new york city building code, with the
exception of which of the following, any construction equipment that would affect public safety
must be inspected before use.
40 feet - Answer at what height mist a permit and a professional seal be obtained for the
erection of supported scaffolding
when the building is razed down to the top of the shed - Answer when a sidewalk shed is
required during the demolition, the shed can be removed when