OIS 3660 FINAL EXAM QUESTIONS AND
ANSWERS GRADED A+ 2026
What is Big Medicine?
A.) A combination of a hospital, a department store, and a home-improvement company
B.) Larger pills that dissolve faster
C.) A hospital that treats people who ate at the cheesecake factory
D.) Larger chains of hospitals that offer low cost high quality care - ANS D.) Larger chains of
hospitals that offer low cost high quality care
At the core, what is Operations Management about?
A.)Outsourcing work to China
B.) Processing inputs into outputs
C.) Operating a Management team
D.) Applying math to problems - ANS B.) Processing inputs into outputs
Which requires the most skilled labor? Someone working in a...
A.) Line Flow
B.) Batch Flow
C.)Flow Shop
D.) Job Shop - ANS D.) Job Shop
@COPYRIGHT 2026/2027 ALL RIGHTS RESERVED
1
, What is the main input for an airport out of Passengers, Customs Agents, Crew, or airplanes? -
ANS Passengers
What is NOT a resource for an airport out of Passengers, Customs Agents, Crew, or airplanes? -
ANS Passengers
What is the output of an airline out of Finished airplanes, Passengers at their destination, Pilots
and flight attendants, or Used up airline fuel? - ANS Passengers at their destination
Why should you study Operations Management?
A.) All the other answers are correct
B.) It tells you how to make money
C.) It tells you how to manage transformations from inputs to outputs
D.) It teaches you how to think logically - ANS A.) All the other answers are correct
Which of the following products is most likely produced in a flow shop out of Airplanes, Custom-
made bicycles, Crude oil, Nascar racecars? - ANS Crude Oil
Which of the following requires the least skilled and most repetitive labor out of Job shop,
Barber shop, Line flow, Batch flow? - ANS Line Flow
If you want to produce a standard product in extremely large quantities, then you should work
according to a... - ANS Flow Shop
How are the concepts of utilization and a bottleneck linked?
A. The utilization is mathematically the same as one divided by the bottleneck
B. Each processing step has a utilization and a bottleneck threshold
C. The process step with the highest utilization is the bottleneck in the system
D. Higher capacity means higher utilization means a higher chance at a bottleneck - ANS C.
The process step with the highest utilization is the bottleneck in the system
@COPYRIGHT 2026/2027 ALL RIGHTS RESERVED
2
ANSWERS GRADED A+ 2026
What is Big Medicine?
A.) A combination of a hospital, a department store, and a home-improvement company
B.) Larger pills that dissolve faster
C.) A hospital that treats people who ate at the cheesecake factory
D.) Larger chains of hospitals that offer low cost high quality care - ANS D.) Larger chains of
hospitals that offer low cost high quality care
At the core, what is Operations Management about?
A.)Outsourcing work to China
B.) Processing inputs into outputs
C.) Operating a Management team
D.) Applying math to problems - ANS B.) Processing inputs into outputs
Which requires the most skilled labor? Someone working in a...
A.) Line Flow
B.) Batch Flow
C.)Flow Shop
D.) Job Shop - ANS D.) Job Shop
@COPYRIGHT 2026/2027 ALL RIGHTS RESERVED
1
, What is the main input for an airport out of Passengers, Customs Agents, Crew, or airplanes? -
ANS Passengers
What is NOT a resource for an airport out of Passengers, Customs Agents, Crew, or airplanes? -
ANS Passengers
What is the output of an airline out of Finished airplanes, Passengers at their destination, Pilots
and flight attendants, or Used up airline fuel? - ANS Passengers at their destination
Why should you study Operations Management?
A.) All the other answers are correct
B.) It tells you how to make money
C.) It tells you how to manage transformations from inputs to outputs
D.) It teaches you how to think logically - ANS A.) All the other answers are correct
Which of the following products is most likely produced in a flow shop out of Airplanes, Custom-
made bicycles, Crude oil, Nascar racecars? - ANS Crude Oil
Which of the following requires the least skilled and most repetitive labor out of Job shop,
Barber shop, Line flow, Batch flow? - ANS Line Flow
If you want to produce a standard product in extremely large quantities, then you should work
according to a... - ANS Flow Shop
How are the concepts of utilization and a bottleneck linked?
A. The utilization is mathematically the same as one divided by the bottleneck
B. Each processing step has a utilization and a bottleneck threshold
C. The process step with the highest utilization is the bottleneck in the system
D. Higher capacity means higher utilization means a higher chance at a bottleneck - ANS C.
The process step with the highest utilization is the bottleneck in the system
@COPYRIGHT 2026/2027 ALL RIGHTS RESERVED
2