LEED v4 GA Practice Exam Questions
Questions and Correct Answers/ Latest
Update / Already Graded
USGBC Logo Policy Exception
Ans: The logo must include a trademark, except for repeated
logos.
Mixed Use Project Certification
Ans: Residential apartments over ground floor retail core need
LEED BD+C: Core & Shell.
LEED Online Documentation Manager
Ans: The primary project team member managing project
documentation.
Life Cycle Assessment
Ans: Analyzing environmental, social, and local impacts of a
material.
Nonpotable Water Definition
All rights reserved © 2025/ 2026 |
, Page |2
Ans: Water not meeting drinking standards, excluding
greywater treated on-site.
Post-Consumer Recycled Content Source
Ans: Recycled content sourced from residential and
commercial waste.
Pre-Consumer Recycled Content Examples
Ans: Concrete with fly ash, metal studs from scrapped
automobiles, insulation from denim scraps.
Construction Waste Plan Elements
Ans: Includes waste diversion goal, waste types, local recycling
resources.
Community Connectivity Improvement
Ans: Enhancing project connectivity via trails, transit passes, or
mixed-use spaces.
VOC Content Source
All rights reserved © 2025/ 2026 |
, Page |3
Ans: Information found typically on Material Safety Data
Sheets.
Public Transportation Benefit
Ans: Increasing access reduces vehicle miles traveled.
CFC Refrigerant Ban Year
Ans: Montreal Protocol banned CFC production in developing
countries starting in 1996.
Rapidly Renewable Materials
Ans: Include linoleum, wheatboard, and bamboo.
Chlorofluorocarbon Equipment
Ans: Found in chillers and air compressors.
Low-Emitting Carpet Qualification
Ans: Green Label Plus for carpeting and Green Label for carpet
pad.
All rights reserved © 2025/ 2026 |